Laserfiche WebLink
Site Address: ( 6mmoo C rA0 Ct ''P, Y4V? 5 O ,Wate of Testing/Servicing: <br /> F. In jTank Gauging/SIR Equ ent: Er+Check this box if tan auging is used only for inventory control <br /> 13 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> -1 Yes I ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground'faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes '❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ 'No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> I <br /> Complete the following checklist: <br /> P-Ves ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: �h.; ❑0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> CT Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> CSA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ®"'N-/A -or disconnected? <br /> ❑ Yes E3 o* For electronic' LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> IMS''N/A malfunctions or fails a test? <br /> ❑ Yes L❑ o* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />