Laserfiche WebLink
0 <br /> S.WRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT UD TESTING <br /> Test Method Developed By: U UDC Manufacturer U Industry Standard ,A$rofessional Engineer <br /> U tither{Specify) \ <br /> Test Method Used: U Pressure U Vacuum , -Hydrostatic <br /> Li Other(Spec ) <br /> 0TeW9EqLU1ipm-,-,nW,Used-: 4!!jT,, uG L era ke' Equipment Resolution: Y,ldrz�ftr3 <br /> UDC#'7 f UDC# t 10 UDC# ( UDC# I Manufacturer: $ra v v P ,gyp <br /> UDCMateriaL• G_ 44-ccls it. ram t,...- ,. <br /> UDC Depth: If <i T// <br /> Height from UDC Bottom to Top S: - (6,...n4,-a4-s <br /> Of Highest in Penetration: 60,"W t'` 3 s <br /> Height from UDC Bottom to } <br /> Lowest Electrical Pene4a pip 5W- e6-rA MGwt 4-5 4 r 4-S <br /> Condition of UDC prior to <br /> Portion of UDC Tested A)4, UWL,7`r W*,L-er L.W4?', l!/a tr L'?" Wet 'f• L 7r1 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both U Yes p No UNA U Yes JgNo UNA U Yes .J o UNA U Yes o UNA <br /> roduct.and water)?� <br /> Turbine shutdown response time N r✓ A- .✓ �- n/lst- <br /> Is system programmed for fail- 11d°Yes U No U NA es UM UNA UNo UNA es UNo UNA <br /> safe shutdown?* '\ <br /> Was fail safe verified tube ° 'Yes UNo UNA <br /> o onal?' es UNo UNA ; Yes U No U NA kYes UNo UNA <br /> Wait time between applying <br /> pressurelvacuumlwater and <br /> starting test /p Mm-z 45 p WXht <br /> Test Start Time: 3 Dp , <br /> . ti -7. 5 v <br /> Initial Reading 04): e ¢-cot-G e Ys dcf <br /> Test End Time: a o 0 <br /> Final Readin <br /> Test Duration 30 5 3a oiir,44.s 30 ri7 <br /> Change in Readin : tJe N& a cwa <br /> Pass/Fail Tlueshoid.or Criteria: Girt t'E n 3srry,�. Grrz/e,rn Ir a rr p tpr na, <br /> W sensor removed for testing? u Yes ,"o U NA U Yes ,UNo U NA U Yes ,UNo U NA U Yes 1No UNA <br /> G cc. UCt 5 ` '\ <br /> Was sensor properly replaced ands U No LrNA <br /> verified functional after testing? es UNo LINA es U No C1-NA es UNo UNA <br /> Comments- include information on re airs ma apnor to testin and recommended oltow-u or ailed tests <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to of the questions irxlicated with an <br /> asterisk is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />