Laserfiche WebLink
SWRCB,January 2002 9 <br /> Page�of I <br /> 9. SPILLIOVERFILL CONTAINMENT BOXES <br /> Facility is Not Kquipped With S 'll/Qverfill Containment Boxes U <br /> SP"Uo vesfili Conta""MD t Boxes are Present,but were Not Tested <br /> W Method Developed By: U Spill Bucket Manufacturer U Ind <br /> . ustry Standard U Professional Engineer <br /> U Other(Spee) <br /> Test Meth U Pressure U Vacuum <br /> U Other eci U Hydros . <br /> f <br /> Test Equipment Used: sP .1J') <br /> Equipment cation: <br /> Sp <br /> Bucket Diameter: z# Spaal Box# Spall BOY# Spall Bax# <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startin test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change . (RF-R,): <br /> P ail Threshold or <br /> riteria: <br /> 075-7 R <br /> .. '�. ...:..Slro..:Y'til': 4.:.9 `•'. t1 „L<5..4 Y .�t1t4` '<L33S!. i 9'> +i%i- .;}iiu_ <br /> v., <br /> a <br /> t ,. <br /> .....:......:.:: ..:.::.tths:t tr-tt tet'•:itiR" {n <br /> Com eIIiS— ude in ormation on r airs made rior to testm and recommended ollow-u or ailed tes <br /> M <br />