Laserfiche WebLink
Results of Testing/Servicing-J <br /> D• <br /> Software Version Installed: �'✓ . f� <br /> l <br /> Complete the following checklist: <br /> es ❑ No* Is the audible alarm operational? <br /> C1 No* Is the visual alarm operational? <br /> Ye ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> es ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? _ <br /> 0 Yes �—N�/A <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> operational? <br /> es ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, o is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? es; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> /A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fli point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? <br /> ❑ Yes* o Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> 13'Yes* ❑ No Was 1jquid found inside any secondary containment systems designed as dry systems? (Check all that appy) <br /> EJ-I roduct; ❑Water. If yes, describe causes.in Section E,below. <br /> [:13:—Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> C3Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: �� Y`� Lc9 S ��. F ,a , � G v r -u r t� l` <br /> [� � 1Jf � 'P � `�' / lam"( C �a ff✓`..✓ s-i �. aP""`.' e.>® /f'! L=r /'_ r. f ,�' "2.2�y.` �;. mak, ,�s�,!^�',`eaj-��:..' <br /> Nd <br /> j <br /> f { <br /> �.. t ✓ ..: .®gam � c,.1' ?v;- °°'Y+ �"i,_ �t.`�Vel C-'� °�J �„�! �(A e., vw.'r.. '}:,,.�'f`.ri'�.�. <br /> asp <br />