Laserfiche WebLink
, FRbM CANEPA'S FAX NO. : 4786342 Apr. 24 2002 08:36AM P1 <br /> v;RITTF-N M0141TORJLNG AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> -rnjs progmrn mast be kept at tie 11ST location at all tirnes,The information on this monitoring program are <br /> conditions of the operating permit.The permit holder worst notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obmin approval or a perrWt before zrW&in9 <br /> the change.Required by CCR 2612(d)and 2641(h) <br /> FAciury NAME <br /> Dp <br /> ,ss (P —6 —x A -- z3+6c Ca <br /> iFACILITY ADDRESS_ <br /> I.Na=($)and Title(s)of the people responsible for performir 9 the monitoring and/or maintenance <br /> IL Lj . <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS TV npixG 1,40a,0,11191 <br /> ' 0j se 40 sora <br /> 3.Desc6be the locations) of where the monitoring will I be perf..)rmed. ie.-locationf <br /> 4.Describe thefollowing equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel <br /> Name and Model of Line Lcak Detectors 4'AI)JE <br /> Name and MO&I.of Annular Sensors <br /> Name acid Model of Piping Sensors <br /> NaTne and Model of Dispenser Sensors <br /> Type of overfill prevention <br /> 5Mo the Turbine Sensors and Qispeneetl 7.aft-v 6v�" ut down the turbine? Yes No 0 <br /> Does the turbine shut down if a sensor is disconnected? Yes W, No D <br /> Does the turbine shut down ig-the monitoring panel loses bower? Yes I/ No 0 <br /> 6.llfo ,, 11 the term hi trey ar.d subsequent rngiritenance be recorded?_ Az. iVee <br /> 7.Maintenarice of the monitoring equipment must be perforr red at least once every 12 rnonft- <br /> Descm. ibe the preventive maintenance schedule and recorAing fdy-onipring equipment What month will <br /> 9r In <br /> annu4 tnonitoring certification be nerformed in 6-t <br /> r <br /> Note:For ne-Installations YhesilcondarY containment must be nonth-i a far installation.Alt secondarycontainmen:systems <br /> ,j� <br /> must be tested once every.36m4wths with initial testing performed before Deceml,er31,2003. <br /> B.Describe the tral gnecesgary for the oppration of USF systerr..,including piping, the monitoring <br /> T i.. <br /> 'h TP, 11, <br /> equipment. I lu 0 iroa-k'u e4—4 n k- V f-ec I <br />