Laserfiche WebLink
L] <br />C. REQUIRED PROTECTION <br />E <br />SITE HEALTH & SAFETY PLAN <br />It is anticipated that level D work clothing will be <br />worn during the tank removal phase of the project. <br />(Unless any liquids are encountered, then personnel will <br />upgrade to level C, P.E. Tyvek or similar). In <br />addition, however, the personnel working on the project <br />will be required to wear surgical under gloves (latex), <br />and chemical outer gloves. As the project involves the <br />removal of underground storage tanks, and the taking of <br />soil samples, the potential exposure anticipated is with <br />the contact with potentially contaminated soils. <br />Historical information indicates the possibilities of <br />encountering fuels from leaking lines or tanks. <br />Should the readings with the LEL indicate the presence <br />of contaminated materials near the TLVs of the materials <br />analyzed, or if the colormetric tubes indicates the <br />presence of Benzene, or if the LEL meter (set in ppm <br />reading range) indicates vapor readings approaching the <br />75-100 ppm range of total organic compounds, the <br />personnel assigned to the project will upgrade their <br />personal protection with appropriate clothing and <br />respiratory protective equipment. That equipment will <br />include the selection of the proper cartridges for the <br />anticipated exposure. <br />Walton Engineering, Inc. and "Environmental Consultant" <br />will provide their employees with appropriate personal <br />protective equipment as required. If respirators are <br />deemed necessary, only NIOSH/MSHA certified respiratory <br />protective equipment will be utilized. Walton <br />Engineering, Inc. subcontractor(s) are responsible to <br />supply the appropriate safety equipment for their own <br />employees. <br />9 <br />