My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:43:38 PM
Creation date
6/3/2020 9:46:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />11 <br />SITE HEALTH & SAFETY PLAN <br />2. Actions to be taken will be dictated by the <br />emergency condition. <br />3. Power equipment will be shut down and operators will <br />stand by for instruction. <br />4. Injured personnel will be transported to the <br />Contamination Reduction Line. <br />5. In case of a fire, explosion, or hazard alarm, <br />personnel will immediately proceed to assigned pre- <br />arranged safe locations. <br />6. Upon arrival at the safe locations, a complete head <br />count will be given to the Project Safety officer <br />and the Project Superintendent and personnel will <br />stay at the safe locations until the area is <br />secured. <br />D. PERSONAL INJURY <br />If an injury occurs due to an accident or exposure to a <br />hazardous substance, Walton Engineering, Inc. will be <br />notified. The Project Superintendent will be given all <br />appropriate information concerning the nature and cause <br />of the injury so that treatment preparations can be <br />initiated. The injured person will be transported to <br />the Contamination Reduction line where appropriate first <br />aid and treatment can begin. The Project Superintendent <br />will be informed and will investigate the cause of the <br />injury and make any necessary changes in work <br />procedures. <br />E. AMBIENT MONITORING CONTINGENCIES <br />When ambient monitoring on the downwind edge of the site <br />indicates significantly higher than background levels <br />of any contaminants, the Project Safety Officer and <br />Project Superintendent will immediately determine the <br />cause, make changes to work practices or procedures, and <br />if necessary, make changes in site layout and warn <br />unprotected personnel to evacuate or don protective <br />equipment. <br />In the event of an accident resulting in physical <br />injury, first aid will be administered; and the injured <br />worker will be transported to the nearest hospital for <br />emergency treatment. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.