My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:08:30 PM
Creation date
6/3/2020 9:46:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1997-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRO ENTAL HEALTI&EPARTMENT <br /> SAN JOAQUIN COUNTY <br /> a Unit Supervisors <br /> Donna K.Heran,R.E.H.S. <br /> 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Director Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> cgiFORP Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> September 2, 2004 <br /> Elite N Contractors <br /> 2535 Wigwam Dr. <br /> Stockton CA 95205 <br /> Re: West Lane Fuel @ 3300 West Lane, Stockton <br /> Your permit application to install new spill buckets and a drop tubes at the above referenced <br /> location has been approved with the following conditions: <br /> 1. Contact EHD to schedule the following appointments: <br /> a. If the spill buckets are directly buried you must contact EHD prior to backfilling <br /> the new spill buckets, EHD must inspect the riser for cathodic protection. <br /> b. EHD must verify the overfill prevention system is in compliance with CCR 2635 <br /> (b)(2). Note: Your company may chose to have EHD onsite during the overfill <br /> prevention system installation so that portions of the system do not have to be <br /> disassembled/reassembled. <br /> c. The spill buckets must be tested to ensure they hold a minimum of 5-gallons. <br /> 2. If concrete is broken over the underground storage tank then a tank integrity test must be <br /> performed once concrete is poured,prior to the contractor signing off of the jobsite. This <br /> office must receive results within 7 days of completing the work. <br /> 3. Contact the Fire Department and San Joaquin Valley Air Pollution Control District for <br /> applicable permits. <br /> 4. Allow 48-hour advance notice for scheduling inspections with this office. <br /> 5. This permit expires 90 days from the approval date. <br /> If you have any questions please contact me at (209) 468-9847. <br /> Thank you, <br /> Michelle Le,REHS <br /> Senior Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.