My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:08:30 PM
Creation date
6/3/2020 9:46:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1997-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK # <br />#230o -L} <br />03300-5 <br />UST <br />SYSTEM DRAWING INFORMATION <br />CAPACITY <br />1. <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. <br />Plans drawn to scale in non -erasable print. <br />MANUFACTURER <br />3. <br />Plot plan to show location of tanks and all associated piping. <br />4. <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />STEEL/fp-f <br />5. <br />Tank cross-sectional diagram. <br />6. <br />Detail of tank, associated piping, excavation and cover. <br />6LUT/1otJ <br />7. <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />ZE(s. VNL <br />Article 3, Section 2631 (b) & 26351 <br />g, <br />Verification of product compatibility with the tank(s), piping, monitoring <br />% eS <br />S/E 5 <br />device(s), epoxy or silicone glues, etc. <br />9. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />TFS <br />10. <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(1°) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)J <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS -END from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />• 1 <br />Chapter 6.7, Section 25291 (h)) <br />v -17TW <br />TANK # <br />#230o -L} <br />03300-5 <br /># # <br /># <br />CAPACITY <br />01 OOO G• <br />S O 00 6c <br />MANUFACTURER <br />1UOOR <br />300 <br />COMPOSITION <br />STEEL/fp-f <br />$TEELI F(LP <br />MODEL <br />F_LUT"A) <br />6LUT/1otJ <br />PRODUCT <br />ZE(s. VNL <br />SUP. VnJL. <br />CORROSION PROTECTION <br />% eS <br />S/E 5 <br />U.L. LISTED <br />y eS <br />TFS <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />_ (1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />B. <br />C. <br />Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />Non -clad steel tank [Section 2635 (a) (2) (AM <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.