Laserfiche WebLink
PLASTE OELUTRO <br />APPENDIX A <br />° Double -Wall <br />INSTALLATION SITE TESTING PROCEDURES <br />Option #1: EXTERIOR HOLIDAY TEST <br />Prior to arrival of the Elutron@ tank at the installation <br />site, coordinate with the Elutron@ manufacturer to have <br />a 12,500 volt holiday test performed using a Tinker-Rasor, <br />Model APW, tester. Any pinholes detected must be <br />repaired using the Plasteel@ sealing kit materials. Re -test <br />and repair until tank is pinhole free. This test must be <br />performed by a person qualified by the Elutron@ tank <br />manufacturer. <br />Option #2: VACUUM TEST INTERSTICE <br />Tank <br />The Elutron@ tank may be delivered with an interstitial vacuum; established at <br />the factory. Jhe delivery document will state the vacuum gauge reading required <br />for acceptance at the delivery location. Record the vacuum gauge 4eading on the <br />delivery document when the tank is delivered. If the vacuum gauge has decreased <br />from the vacuum gauge reading listed for acceptance on the delivery document, <br />call the factory for further instructions. If an interstitial vacuum is to be established <br />at the installation, follow the instructions in Appendix B, Interstitial Vacuum Test. <br />DO NOT apply a vacuum to the primary tank, DAMAGE MAY OCCUR. <br />Option #3: PRESSURE TEST INTERSTICE <br />If a field pressure test is required, set-up test equipment per the schematic diagram and precisely follow the test procedures listed. <br />CAUTION: DAMAGE TO TANK MAY OCCUR IF PRESSURE IN THE <br />INTERSTICE EXCEEDS 2 PSIG ABOVEGROUND. <br />Step 1. Ensure gauges are accurately calibrated. 8. Observe G2 for 30 minutes. G2 should remain at <br />11/2 - 2 psig. (Call factory if G2 decreases to zero.) <br />2. Ensure all connections are leak tight. 9. Open V3, vent interstice, G2 to read zero. <br />3. Close V2, open V3, G2 should read zero. <br />4. Open V1, pressurize primary tank until G1 reads <br />3-5 psig, close V1. Disconnect air source. <br />5. Close V3, after 30 minutes, check G2. G2 should read <br />zero. (Call factory if G2 does not read zero.) <br />6. Open V1 and decrease G1 to 11/2 - 2 psig. Close V1. <br />7. Open V2, pressurize G2 to 11/2 - 2 psig. Close <br />V2. DO NOT EXCEED 2 PSIG ON G2. DAMAGE <br />TO TANK MAY OCCUR. <br />Pressure Test Equipment Specifications <br />Gauges: 5 psig maximum scale <br />Valves: Globe type, 30 psi min. <br />Pressure Relief Device: 5 psig max. <br />INTERSTICE PRESSURE GAUGE (132) <br />MONITOR <br />FITTING <br />FRP LAMINATE <br />SECONDARY WALL <br />INTERSTICE <br />STEEL PRIMARY <br />INNER TANK <br />MONITOR TUBE <br />10. Open V1, vent primary tank, G1 to read zero. <br />Test complete. <br />NOTE: If the Elutron@ tank is covered with backfill, you may <br />test the interstice at 3-5 PSIG, following steps #1-10, and carefully <br />increasing the pressure in step #7 to 3-5 PSIG. In step #8, G2 should <br />remain at 3-5 PSIG. <br />CAUTION: DAMAGE MAY OCCUR IF INTERSTICE <br />PRESSURE EXCEEDS 5 PSIG. WHEN TANK IS <br />COVERED WITH BACKFILL. <br />PRESSURE BLEED -OFF VALVE (V3) <br />VALVE (V1) <br />VALVE <br />(V2) <br />PRIMARY TANK <br />FITTINGS <br />W CT-.-19-QSd <br />OVEMM AIR SOURCE <br />(G1) <br />PRIMARY TANK PRESSURE GAUGE <br />5 PSIG <br />PRESSURE <br />RELIEF. <br />DEVICE <br />TANQUES ZORN <br />GUMEX TANX INC. INDUSTRIES <br />Torreon. Mexico Clarenont, NH ENW. IN <br />52.17-50.6110 (603) 543.1272 (219) 266.1433 <br />Fax 52-17-50.6130 Fax(603)543.1270 Fax (219) 266.1012 <br />/I, <br />.............................C:.:'::. <br />u <br />.:' :'.'. :.'::::.'.':.'...... <br />::'. .':::.'.'::.': .'::': .'.'.'.':.'.''.'.l <br />:'.'...:'.'.'.'.'r.':.'. <br />Authorized <br />PLASTEEL® ELUTRON® tank manufacturers <br />INDUSTRIA <br />JAPAN <br />JEEWON <br />METAL <br />HERKULES TVG <br />ACERO <br />STEEL WORKS <br />INDUSTRIAL CO. LTD. <br />JOOR MFG. <br />K S T STEEL <br />PRODUCTS <br />Tab, Hungary <br />Quito, Ecuador <br />Tokyo, Japan <br />Seoul, Korea <br />Escondido, CA <br />Twin Falls, ID <br />Suwanee, GA <br />36-84.320.211 <br />593.2.503.600 <br />81-423-30-8007 <br />82.2.585.0821 <br />(619) 745-0971 <br />(208) 7334554 <br />(404) 945.8383 <br />Fax 36.84.320-624 <br />Fax 593-2.503-633 <br />Fax 81.423.30.8022 <br />Fax 82.2.585-0820 <br />Fax (619) 746.9515 <br />Fax (208) 733.7239 <br />Fax (404) 932-5671 <br />W CT-.-19-QSd <br />OVEMM AIR SOURCE <br />(G1) <br />PRIMARY TANK PRESSURE GAUGE <br />5 PSIG <br />PRESSURE <br />RELIEF. <br />DEVICE <br />TANQUES ZORN <br />GUMEX TANX INC. INDUSTRIES <br />Torreon. Mexico Clarenont, NH ENW. IN <br />52.17-50.6110 (603) 543.1272 (219) 266.1433 <br />Fax 52-17-50.6130 Fax(603)543.1270 Fax (219) 266.1012 <br />