My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 2:08:30 PM
Creation date
6/3/2020 9:46:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_1997-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A 01 r 11, <br />, <br />FOR THE <br />TANK <br />In compliance with part 280 of Title 40 of the Code of ELUTRONe TANK DATA <br />Federal Regulations, this document may be implemented to <br />meet Subpart B, paragraph 280.2 (e), CERTIFICATION OF The U.L. Label and serial number is on the top centerline of the <br />INSTALLATION. tank and also listed on the delivery document. <br />The installer must initial all sections below representing SIZE IN GALLONS U.L. SERIAL NUMBER <br />that the installer has read, was cognizant of and has com- <br />pleted, as applicable, all sections of the PLASTEELe — <br />ELUTRONe Tank Installation Instructions attached hereto. <br />Return completed form to manufacturer to activate <br />warranty. _ <br />INSTLLATI CHECK–OFF — — <br />COMPLETION LIST INSTALLATION COMPANY <br />SECTION INITIAL DATE <br />I.GENERAL <br />II. VISUAL INSPECTION <br />III. HANDLING <br />IV. EXCAVATION DEPTH, BEDDING AND BACKFILL <br />V. ANCHORING SYSTEMS <br />VI. TESTING <br />VI E TI G• JACKETED <br />NAME <br />ADDRESS <br />CITY, STATE, ZIP <br />TELEPHONE <br />i. V N N <br />INSTALLATION COMPLETION/SUPERVISOR'S SIGNATURE <br />VIII. PLASTEELD SEALING PROCEDURES <br />INSTALLATION DESCRIPTION <br />The responsible supervisor's signature below represents <br />that phases I through VIII were properly completed per the <br />PLASTEEL° ELUTRONO Installation Instructions: <br />INSTALLATION SITE <br />SIGNATURE DATE <br />ADDRESS <br />PRINT NAME <br />CITY, STATE, ZIP <br />PLASTEELe TANK OWNER <br />YOUR PLASTEEL® TANK MANUFACTURER IS: <br />NAME <br />NAME <br />ADDRESS <br />ADDRESS <br />CITY, STATE, ZIP <br />CITY, STATE, ZIP <br />SIGNATURE DATE <br />TELEPHONE <br />RETURN COMPLETED FORM TO MANUFACTURER TO ACTIVATE WARRANTY , <br />FORM INST CERT -1193E <br />
The URL can be used to link to this page
Your browser does not support the video tag.