Laserfiche WebLink
SWRCB,January 2002 Aft Page L of <br /> 9. SPIL OVE ILL CONTA 1mTT BOA <br /> 01 <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: Equipment Resolution: <br /> r Spill Box# 1 Spill Box# Spill Sox# Spill Box# <br /> Bucket Diameter: ! / <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: - DOCS /rod <br /> Initial Reading(Rj): <br /> Test End Time: 00 / <br /> Final Reading(RF): <br /> Test Duration: r2 <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result• Pass ❑Fail Pass ❑Fail ❑ Fass ❑Fail ❑ Pass ❑Fail <br /> Commends (include information on repaifs made prior to testing and recommended follow-up for failed tests) <br /> Please direct any comments regarding this form to: <br /> SWRCB UST Program,Attn: Scott Bacon <br /> 1001 "P'Street,Box 944212 <br /> Sacramento,CA 95814 <br /> Phone: (916)341-5873,Fax:(916)341-5808 <br /> e-mail:bacons@cwp.swrcb.ca.gov <br />