My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3300
>
2300 - Underground Storage Tank Program
>
PR0231289
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:58:19 PM
Creation date
6/3/2020 9:46:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231289
PE
2361
FACILITY_ID
FA0003847
FACILITY_NAME
WEST LANE FUEL
STREET_NUMBER
3300
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11705037
CURRENT_STATUS
01
SITE_LOCATION
3300 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231289_3300 N WEST_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN: ED STEARNS <br /> Cert# Exp. <br /> Site: WEST LANE FUELS Date: 7/26/18 Time: LOAM <br /> Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL Nozz/Fuel 20 CFH 60 CFH 100 CFH PASS/FAIL <br /> Grade (.15"Water) (.45"Water) (.95"Water) Grade (.15"Water) (.45"Water) (.95"Water) <br /> .60CFH .80CFH --- --- <br /> 1 ALL .23 .37 PASS --- <br /> 2 ALL .23 .35 PASS --- <br /> 3 ALL .25 ,36 PASS --- <br /> 4 ALL .24 .35 PASS --- <br /> 5 ALL .25 .36 PASS --- <br /> 6 ALL .25 .38 PASS --- <br /> 7 ALL .27 .36 PASS ` --- <br /> 8 ALL .24 .34 PASS r --- <br /> LIQUID REMOVAL CHECK **See Long Form Test Report for Wet Failure Testing Blockage Tester Integrity: <br /> D=Dry 1 .50"w.c.A 5 minutes PASS <br /> l ®DRY ❑DRY ❑DRY []DRY []DRY []DRY ❑DRY ❑DRY []DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> 2 ®DRY []DRY []DRY ❑DRY ❑DRY []DRY ❑DRY ❑DRY ❑DRY <br /> Int ml ml ml ml ml ml ml ml <br /> []DRY []DRY []DRY ❑DRY []DRY []DRY []DRY []DRY ❑DRY <br /> M1 ml ml ml ml ml ml ml ml <br /> ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY ❑DRY <br /> ml ml ml ml ml ml ml ml ml <br /> ® Job Complete Repairs Done to Pass Test: <br /> ❑ Not Complete -Repairs Still Needed: <br /> Parts: None Drop Tube rings Fill Adaptor Gaskets Hoses Whip Hose <br /> Nozzles Breakaways PV Valves Others: <br />
The URL can be used to link to this page
Your browser does not support the video tag.