My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 11:12:57 AM
Creation date
6/3/2020 9:46:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231333_236 N HAM_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iANI�NCJLOGY _.. UNDERGROUND LEAK DETECTION SYSTEM (V6.21) <br />C.f i VRON,P?6 <br />HOU0495-24-131962 - Apr 10, 1995, 16V <br />Customer: Site 1: Service Order4: <br />CHEVRON USA 94183 131962 <br />Address: City/St: Zip: <br />236 WHAM LN. LODI, CA 95242- <br />W FIT N:::::............r ll:::::::: "':::::, Q.. if.:., llAT C::::1 W 8:;::: W 4, 8:AT ii:::: <br />The following items must be signed for prior to starting tank and/or <br />line testing at site: <br />1) The location rezprasentative understands that. PRIOR to FUEL_ DROPS the Unit <br />Manager must stop testing and place the complete station back .Into working <br />order. <br />2 ,) The location representative: understands that the pumps, dispensers and <br />electrical supply must stay disabled throughout the test. <br />3) All associated power breakers have been turned off for testing. <br />4) Magnetic signs have been placed on power breaker boxes. <br />5) Out of Service bags are on dispenser r no:zrles . <br />6) Padlocks are on dispenser nozzles. <br />7) Check valve is closed. <br />8) Bayonet connector is disconnected from pump. <br />9) All safety procedures have been discussed with all station personnel.. The <br />Location Representative and Tanknology Unit Manager have each confirmed <br />that the Tag and Lockout procedures a. •r e in effect. <br />The Location Representative agrees that the above items were explained <br />and completed prior to the start of Tank and/or Line Testing. <br />Location Representative's Name <br />Unit Manager Name: <br />RANDY ALDGEDGE <br />062 <br />Date: <br />Date: <br />1` <br />
The URL can be used to link to this page
Your browser does not support the video tag.