My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 11:12:57 AM
Creation date
6/3/2020 9:46:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231333_236 N HAM_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KNOLOGY- 9 0 <br />MANDATORY r & Lock -Out <br />• Quality Assurance Post-test• "` <br />.- <br />iPRE-TEST PROCEDURE: <br />1 The following items must be signed for prior to starting tank and oi� <br />'testing at site: <br />1) The station manager understands that PRIOR to FUEL DROPS the Unit Manager <br />must • •testingand place_ complete . • back into working • • <br />_ stationr moi•understandspumps,dispensersandelectrical supply <br />must stay disabled ' r • - <br />3) All associated powerbreakers-been turned off for i <br />• Magnetic signs- beenplaced f powerbreaker boxes. <br />"Out of Service' bags are on dispenser nozzles. <br />6) Padlocks are on dispenser nozzles. <br />closed.5) <br />7) Check valve is <br />Bayonetdisconnectedfrompump. <br />i AJIsafety procedures - beendiscussedw • ' personnel. The Station <br />s • • • • •Unit Manager • ithat the. • i • • <br />Manager <br />procedures are in effect. <br />aboveut <br />.. explained ais <br />The Station Mgr. agrees that the items <br />completed • • . • `Tank and/orTesting. <br />Station• • • } • <br />r - <br />PROCEDURE: <br />stationPOST-TEST <br />,To insure that your operational priorour fest-uniT <br />departing • PLEASE WITNESS the following <br />1) Each dispenser operates, and all 'out -of -service bags & pad -locks were removed. <br />2) There are NO LEAKS in the sub -pump area, even when the pumps are running. <br />13) AJI debris, safety -cones, & magnetic signs have been removed from the work area. <br />4) AJI tanks and dispqnsers, were restored to their oriqinal state. <br />The Station Mgr. agrees that the above Items were witnessed & completed i F <br />,,following the completion of Tank and/or Line Testing. <br />Station Manager Name: <br />sta. mgr.Signature: <br />+1 <br />w <br />UNI Manager Narne: <br />Unit"Mgr. <br />In,\,,,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.