My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 11:12:57 AM
Creation date
6/3/2020 9:46:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231333_236 N HAM_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AB PRECISION ENVIRONMENTAL TESTING PROCEDURES <br />CHEVRON USA SS#94183 <br />236 N. HAM LANE, LODI CA. <br />DEALER: KEN PAIGE <br />(209) 334-2241 <br />TANK SYSTEM #4, 1000GAL WASTE OIL <br />SITE CONDITION <br />The test site located at 236 N. Ham Lane, Lodi, CA was left in <br />the same condition that was present prior to the hydrostatic tank test. <br />The tank was pumped out to enable the dealer further use of the tank <br />for waste oil deposits. <br />TANK TESTING <br />As required by Chevron, the waste oil that was in the tank was removed <br />and diesel #2 was substituted in order to run the Petro -Tice tank test. <br />All coordinations were handled by AB Precision Environmental, including <br />waste oil removal, product delivery and its transfer. After the removal <br />of waste oil and the delivery of testing fluids, a Petro-Tite tank tester <br />was assembled and a hydrostatic tank test was performed in accordance with <br />standard testing procedures. The final outcome for this tank resulted in a <br />pass and met the NFPA 329 tank testing standardcof ±.05gph. Immediately <br />after the test was completed, the tank was pumped dry. <br />
The URL can be used to link to this page
Your browser does not support the video tag.