My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 11:12:57 AM
Creation date
6/3/2020 9:46:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231333_236 N HAM_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ij <br />17. FILL -UP FOR TEST <br />Stick Water Bottom A <br />before Fill -up <br />to % in. <br />a <br />Gallons <br />Fill up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br />Inventory <br />Stick Readings <br />to % in. <br />Q/. w <br />Total Gallons <br />Gallons ea. Reading <br />®?(p <br />O <br />Tank Diameter Q n Product in full tank (up to fill pipe) <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK Hyd"tl Rr� i ® %�°F VAPOR RECOVERY SYSTEM <br />.,1j, 11� r 1960 <br />/ �!+ <br />See manual sections applicable. Check below and record procedure in log (26). CD ri d ! 7-O r ® v �, (p 1960 */ n Stage I <br />F] Water in tank ❑ High water table in tank excavation F1 Une(s) being tested with LVLLT n Stage 11 <br />N 19. TANK MEASUREMENTS FOR <br />1 TSTT ASSEMBLY / <br />ut Bottom of tank to Grade* ..................... <br />tD <br />Add 30" for 4: L ................. H <br />Add 24" for 3" L or air seal ....... / rr <br />Total tubing to assemble Approximate / r r <br />20. EXTENSION HOSE SETTING /7' , <br />Tank top to grade'.......'r <br />Extend hose on suction tube 6" or more <br />below tank top ................. /0 n n <br />'If Fill pipe extends above grade, use top of fill. <br />21. <br />14. Atye`eA V f#/a .3 <br />CQj(,o N gam Ldrit- <br />Zod ,f 9-/0 Co <br />Is Today Warmer? [J Colder? [7 —n F Product in Tank _° F Fill -up Productions <br />Name of Supplier, Owner or Dealer <br />Address No. and Street(s) <br />City -. State Date of Test <br />29. <br />Reading <br />No. <br />Standpipe Level <br />in Inches <br />15. TANK TO TEST <br />16. CAPACITY <br />From <br />Zy <br />^ <br />M <br />act <br />3 • f/�.Q <br />yr <br />Nominal Capacity- <br />Station Chart <br />By most accurate /'y/'� ❑ , <br />capacity chart available v Tank Manufacturer's Chart <br />Sa <br />`- <br />Identity by position <br />Gallons <br />Gallons Company Engineering Data <br />�} <br />82.817f J <br />ratr <br />M <br />Is there doubt as to True Capacity? <br />Charts supplied with "Piro T. Lte <br />gallons <br />Brand and Grade <br />See Section "DETERMINING TANK CAPACITY" <br />Other IAN TESTER <br />Ij <br />17. FILL -UP FOR TEST <br />Stick Water Bottom A <br />before Fill -up <br />to % in. <br />a <br />Gallons <br />Fill up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br />Inventory <br />Stick Readings <br />to % in. <br />Q/. w <br />Total Gallons <br />Gallons ea. Reading <br />®?(p <br />O <br />Tank Diameter Q n Product in full tank (up to fill pipe) <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK Hyd"tl Rr� i ® %�°F VAPOR RECOVERY SYSTEM <br />.,1j, 11� r 1960 <br />/ �!+ <br />See manual sections applicable. Check below and record procedure in log (26). CD ri d ! 7-O r ® v �, (p 1960 */ n Stage I <br />F] Water in tank ❑ High water table in tank excavation F1 Une(s) being tested with LVLLT n Stage 11 <br />N 19. TANK MEASUREMENTS FOR <br />1 TSTT ASSEMBLY / <br />ut Bottom of tank to Grade* ..................... <br />tD <br />Add 30" for 4: L ................. H <br />Add 24" for 3" L or air seal ....... / rr <br />Total tubing to assemble Approximate / r r <br />20. EXTENSION HOSE SETTING /7' , <br />Tank top to grade'.......'r <br />Extend hose on suction tube 6" or more <br />below tank top ................. /0 n n <br />'If Fill pipe extends above grade, use top of fill. <br />21. <br />TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br />31. VOLUME MEASUREMENTS M <br />RECORD TO GAL <br />34' TEMPERATURE COMPENSATION <br />USE FACTOR(a) <br />Is Today Warmer? [J Colder? [7 —n F Product in Tank _° F Fill -up Productions <br />Truck _° F Expected Change ( + or - ) <br />22. <br />Thermal -Sensor reading after circulation °F <br />29. <br />Reading <br />No. <br />Standpipe Level <br />in Inches <br />3/8 digits _ <br />Nearest - <br />35. <br />Thermal <br />Sensor <br />Reading <br />23. <br />Digits per °F in range of expected change <br />Temperature <br />1 <br />At Nips I" record <br />TOW End Deflection <br />Beginning <br />of <br />Reading <br />digits <br />Volume <br />Varome Minus <br />Expansion (+) or <br />Contraction (-) <br />#33(V) -#37(T) <br />At low Lerel compute <br />ewe per Now <br />(NFPAcriteria) <br />24. <br />Q G7 X IF 000 �S3��® <br />�} <br />82.817f J <br />Product <br />Recovered (+) <br />total quantity in 'coefficient of expansion for <br />_ <br />volume change in this tank <br />gallons <br />full tank (16 or 17) involved product <br />per °F <br />('0084) <br />25. <br />Q t� ,ter �? <br />19 A" �J -1- V 18 <br />0 .5-518 <br />= <br />This is <br />volume change per °F (24) Digits per °F in test <br />Volume change per digit. <br />test <br />Range (23) <br />Compute to 4 decimal places. <br />factor (a) <br />28. <br />LOG OF TEST PROCEDURES <br />30. HYDROSTATIC <br />PRESSURE <br />CONTROL <br />31. VOLUME MEASUREMENTS M <br />RECORD TO GAL <br />34' TEMPERATURE COMPENSATION <br />USE FACTOR(a) <br />38. NET VAS <br />CHANGES <br />EACH READING <br />39.ACCUMULATED, <br />CHANGE <br />'17. <br />DATE <br />28. <br />Record details of settingU P <br />and running test. (Use full <br />length of line if needed.) <br />29. <br />Reading <br />No. <br />Standpipe Level <br />in Inches <br />32. Product in <br />Graduate <br />Product <br />Replaced (-) <br />35. <br />Thermal <br />Sensor <br />Reading <br />38. <br />Change <br />Higher + <br />g <br />Lower - <br />(c) <br />37. <br />Computation <br />p <br />x <br />Expansion O + <br />Expansion + <br />Contraction - <br />Temperature <br />1 <br />At Nips I" record <br />TOW End Deflection <br />Beginning <br />of <br />Reading <br />Level to <br />which <br />Restored <br />Volume <br />Varome Minus <br />Expansion (+) or <br />Contraction (-) <br />#33(V) -#37(T) <br />At low Lerel compute <br />ewe per Now <br />(NFPAcriteria) <br />ftyE <br />(24 hr.) <br />Before <br />Reading <br />After <br />Reading <br />Product <br />Recovered (+) <br />
The URL can be used to link to this page
Your browser does not support the video tag.