Laserfiche WebLink
FACIQTY . <br />s <br />r <br />SLtEEPSlU <br />CAPACITY: <br />ALLAIION INSPECTION <br />. • <br />RD <br />+ r' <br />INITIAL INSPECTIONS <br />3. <br />A <br />I <br />1 <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />14. PERFORMANCE' TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br />P <br />I <br />WITH MANUlFACnXMt WRITTEN SPECIFICATIONS <br />R <br />T <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />0 <br />2 <br />10. OVERSPILL PERFORMANCE TEST (CC3t 2635 (A) (4)) <br />18. TANK ACCESS PORTS BROUGHT TO GRADE CLOCKED AND WITERTIGNT) CCCR 201 (D) (5)) <br />V <br />A <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />E <br />L <br />D <br />S <br />22. MDINITORING NETMW FOR ALL TANKS AND PIPING APPROVED (ccR 2641-2644) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />3. <br />PIPING INSPECTIONS <br />INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />V SOAP: PSI: HRS/MIN: BRINE(LIQUID ): OTHER: <br />13. PERFORMANCE TEST OF COITINUOUS,MWITORING SYSTEM (P ) (CCR 2&32 (A) (2)) <br />4. PRIMARY TANK TEST: PSI: HRS/MIN: <br />14. PERFORMANCE' TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br />5. TANK IATELY PLACED WITH Appw4m BACXFILL (CCR 2635 (A) (3) (4) C6)/ API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />12. PERFORMANCE TEST FOR •ALL• MONITORING PROM (CCR 2632 (C) C2)) <br />6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2635 (B) (4)) <br />13. PERFORMANCE TEST OF COITINUOUS,MWITORING SYSTEM (P ) (CCR 2&32 (A) (2)) <br />T. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/"IN: OTHER: CCCR 2635 (A) (4)) <br />14. PERFORMANCE' TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br />16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) C6)) <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />17. OVERFILL PROTECTION INSTALLED/ (ccR 2635 (E) C2)) <br />10. OVERSPILL PERFORMANCE TEST (CC3t 2635 (A) (4)) <br />18. TANK ACCESS PORTS BROUGHT TO GRADE CLOCKED AND WITERTIGNT) CCCR 201 (D) (5)) <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />FINAL INSPECTION <br />12. PERFORMANCE TEST FOR •ALL• MONITORING PROM (CCR 2632 (C) C2)) <br />13. PERFORMANCE TEST OF COITINUOUS,MWITORING SYSTEM (P ) (CCR 2&32 (A) (2)) <br />14. PERFORMANCE' TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br />15. PERFORMANCE TEST OF AUTMTIC PUMP SYSTEM SHUT-OFF (CCR 2635 (B) (5)) <br />16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) C6)) <br />17. OVERFILL PROTECTION INSTALLED/ (ccR 2635 (E) C2)) <br />18. TANK ACCESS PORTS BROUGHT TO GRADE CLOCKED AND WITERTIGNT) CCCR 201 (D) (5)) <br />19. TANK INTEGRITY TEST (PASSINGHARD COPY) (CCR 2635 CA) (5)) <br />20. MONITORING PLAN. RESPONSE KAN AID LOG 300K ON SITE CCCR 2632 (E) Cl) (23) <br />21. `CO FIRM CM4n.ETED AND SUBMITTED (CCR 2635 (E)) <br />22. MDINITORING NETMW FOR ALL TANKS AND PIPING APPROVED (ccR 2641-2644) <br />23. ALL CONDITIONS NET; FACILITY PERMIT ISSUED (H+S CODE 25284 (E) (F)) <br />