Laserfiche WebLink
i <br />4 , <br />4 E. other types of tanks. <br />LClL 0 <br />(1) Chemical composition of material stored is provided. <br />(2) Chemical abstract service number (CAS#) <br />14. overflow protection systems (detail drawing of spill catchment basin(s)/piping sump(s) required, including tank fill and all <br />openings). [Section 2635 (b) (8)] <br />A. Spill catchment basin. <br />Capacity: IN G; <br />Type: sc <br />B. Manyat monitoring (motor vehicle fuels only). <br />(1) Written filling procedure: [Section 2635 (9) (A) (B) (C)] <br />(a) Tank volume capacity is at 103% or +200 gallons. <br />(b) Metered product entering UST and tank capacity <br />determined immediately prior to fitting. <br />C. M <br />ec <br />hanical/Electronic monitoring (mandatory for non -motor vehicle fuel tanks) [Section 2635 (8) (A) (8) (C)] <br />7� (1) Levet sensing device and #2 or #3 below. <br />(2) Audible/visual alarm triggered by a liquid level sensor. <br />(3) Automatic shut-off. <br />15. Double -walled tank and system allow for monitoring of the annular space. <br />[Section 2635 (8) (A) CB) (C)] <br />A. Release from 10 container designed to drain to a specific location within the annular space to be detected by <br />a monitoring device or method. <br />B. Continuous electronic monitoring connected to audible/visual alarm system. <br />C. Type of Detectors (Detail of morxitoring equipment as-ir.7:3 Vnsstaalleed()-.y� <br />(1) Brand Name: P eL.> �: <br />t/ (2) Model Number: 7"Z5 ata <br />(3) Sensor Type: _ Vapor Liquid both. <br />(4) Sensor Specification. _5CP,r�-3 �Q�% <br />�O (5) Brochures provided. <br />VIA (6) Manufacturer's written installation instructions. <br />(7) Location of pryobef r: <br />(tank): 1 7,4A (piping): /►n <br />16. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 10 tank or double - <br />watt UST. [Section 2631 (r)] <br />A. Approved by a nationally recognized independent testing organization. <br />6. Demonstration of integrity with the 10 tank or double waited UST. <br />17. Tanks subject to floatation. [Section 2631 (s)] <br />A. Anchored by deadman or slab. <br />B. Anchors to be installed as specified by manufacturer. <br />C. Installation details provided on plans. <br />D. Calculations provided. <br />18. Fiber liners between tank(s) and excavation to prevent infiltration of native soil into backfill material. <br />F&*A. FA-brIL y c,o <br />