My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 11:12:57 AM
Creation date
6/3/2020 9:46:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231333_236 N HAM_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02 -2? -1996 10:22AM FROJO TO 19163?20911 P.02 <br />- i <br />i <br />i <br />i <br />N MONYrORING PROCEDURES <br />UNDr RGRO ' STORAGE TANK MONTTORIN'G PROGRAM <br />This monitoring program must be kept at the UST Iocation at all times. Tine information on this monitoring <br />program aare conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 469-3420 within 30 daps of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR. <br />Facility Name_ 4M Wo AAJ <br />i <br />Facflity Address 236 t4 4AM f- LQ 0 f <br />A. De�cnbe the frequency of performing the monitoring: <br />Tarhk D441,Y <br />i (Ce)NT JNUA is t' Et,F-C7-90 til CC- :T'dW <br />a <br />N <br />B. W*11 me . thods I and equipment, identified by name and model, will be used for <br />1` f f .t n` the.f 11. i !` <br />C. <br />Descn'be the location(s) where the monitoring anal be performed (facility plot plan <br />should be. attached): _ <br />Ili Ct�1U FI �J�i T or- mw i mc- <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment <br />��ry P��_ s>2 - a wNb2• <br />— cr <br />E. Reporting format for monitoring: <br />Tank -ra P P llyr ® z1f <br />�.1 <br />Pipin <br />F. De' cnbe the preventive maintenance schedule for the monitoring equipment Note: <br />intenance must be in accordance with the manufacturers' Maintenance schedule <br />but'not Iess than every 127 months:_ EUFIZY 12 nl& f s VKr t C'3 �" _ <br />s�IT <br />I <br />G. D4cnbe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment: JEAN 9*S <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.