My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 11:12:57 AM
Creation date
6/3/2020 9:46:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231333_236 N HAM_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v02-27-1996 10:22AM FROM <br />` I0 <br />TO 19163720911 P.02 <br />WRITTEN MONITORING PROCEDURES <br />= RGROUND STORAGE TANK MONUORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. Zine information on this monitoring <br />program rare conditions of the operating permit. The permit holder must notify San Joaquin County <br />Eavirouaneatal Health Division, phone (2M) 468-3420 within. 30 days of any changes to the monitoring <br />procedures, uuless required to obtain approval before making the change. <br />Required by Sections 2632(d) and 2641(h) CCR <br />Facflity Name_ Kdo C <br />Facility Address 236 l,0 / (' S - -- <br />A. s- e the frequency of performing the .... f. <br />_.<1)44ly 04 <br />t , <br />PiDine r; 4S A <br />C. <br />methods . and equipment. identified by ngme and model, will be used 09- <br />fALing the monitoring-. <br />Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached). �/ p�g[� <br />�� .I 06[17 1�� @i�p <br />O AN r 3 YJ1 r <br />D. Lisi,the name(s) and title(s) of the people, responsible for performing the monitoring <br />and/or maintaining r1ment: :FN <br />.. r j <br />/ J / <br />F. Dc' cnbe the preventive maintenance schedule for the monitoring equipment. Note: <br />1V intenauce must be in accordance with the manufacturers' maint nance schedule <br />but not less than every 12 months: �veY (2. d s V r i Bra ---- <br />S' S Q.' - vl <br />I <br />G. D*nbe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment: MLIF 0✓ 4 <br />k <br />
The URL can be used to link to this page
Your browser does not support the video tag.