My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
COMPLIANCE INFO_1986-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 11:12:57 AM
Creation date
6/3/2020 9:46:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1996
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231333_236 N HAM_1986-1996.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
586
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c) If it is obvious (without doing a precision test) that the product <br />has come from the primary tank, Dispatch will immediately arrange <br />for 4 tank pumpout and repair/replace activities will begin. in <br />the ease of repair, the Tank Test coordinator will handle repair <br />arrangements and precision testing. If replacement is required, <br />the project will be handled by the appropriate zone Engineer. <br />d) If the product in the annular space is water entering the tank <br />from the outer shell, repair/replacement activities will take <br />place as noted in "c°' above. <br />e) if it is determined that the liquid in the annular space is water <br />and there are no product losses from the primary tank and no <br />indication of additional water entering the tank, the Tank Test <br />Coordinator will arrange for a precision test of the of the <br />annular space. Based on the results, repair/replacement <br />activities will take place as noted in 11c11. <br />f) If the Maintenance Mechanic or Contractor is unable to determine <br />how the liquid entered the secondary containment the Tank Test <br />Coordinator will immediately have the appropriate precision tests <br />Gond cted. <br />g) If it is determined at any time during the process that there has <br />been a release (defined as product leaking from the primary tank <br />to the annular space or water entering.the annular space from the <br />backfill), a leak report will be prepared and forwarded to the <br />Marketing Assistant - Compliance. The MA - compliance is <br />responsible for reporting to all regulatory agencies required. in <br />addition, the Tank Test Coordinator will prepare and forward a <br />Fiberglass failure report to headquarters. <br />rh <br />
The URL can be used to link to this page
Your browser does not support the video tag.