Laserfiche WebLink
2-20-1906 4:00PH FRO14 FILLNER CONST INC 916 372 6954 R_ 5 <br />FUERGENCY RESPONSE PLAN <br />The Site Supervisor is responsible for implementing the site safety plan and any <br />required emergency response, This responsibility falls to the next senior person at thejob <br />site in the r.sence of r person cooemergency <br />response in this section shall be referred to as the Lead Person. <br />Recognition of and ` emergency <br />Supervisor, but is also the responsibility of all personnel on the job site. Recognition and <br />prevention of #'ncy situations ate covered in the "Code of Safe Practices". <br />eventIn the an emergencysituation,e Lead <br />Person <br />e r evaluate if they have <br />the means to correct the condition causing the emergency. In the event that the <br />rl # <br />not o# site, the Lead Persontelephone 911 foremergencyr sir <br />the resident Construction Engineer shall be notified immediately of the emergency <br /># 1 M li.. <br />All personnel shall be evacuated from the affected area, and moved a safe distance <br />away from the hazard. Site personnel and equipment shall be used to prevent other people <br />from i the affected area until help arrives. NO ONE SHALL ENDANGER <br />THEIR <br />OWN LIFE BY ENTERING A KNOWN HAZARDOUS AREA WITHOUT PROPER <br />TRAINING, EQUIPMENT AND SUPPORT REGARDLESS OF THE REASON- The <br />Lead Person r identify -f by i'`condition,{ shall <br />