Laserfiche WebLink
r N <br /> UNIFIED PROGRAM CONSOLIDATED FORINT TANKS <br /> UNDERGROUND STORAGE TANKS -TANK PAGE 2 <br /> Page_of_ <br /> VI.PIPING CONSTRUCTION check all that acct) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> 459 <br /> SYSTEM TYPE PRESSURE ❑2.SUCTION ❑3.GRAVITY 453 ❑1.PRESSURE ❑2. SUCTION ❑3.GRAVITY a62 <br /> CONSTRUCTION ❑L SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460 ❑1.SINGLE WALL ❑95.UNKNOWN <br /> DOUBLE WALL ❑95.UNKNOWN <br /> MANUFACTURER E32.DOUBLE WALL C199.OTHER <br /> MANUFACTURER*J:�. 463 <br /> / 461 MANUFACTURER <br />' <br /> w/100% NIETHANOL ❑I.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> 1.BARE STEEL ❑6.FRP COMPATIBLE D STEEL <br /> ❑ 7.GALVANIZE <br /> Unknown 2. STAINLESS STEEL ❑ <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑L ❑ <br /> [33.PLASTIC COMPATIBLE W/CONTENTS ❑99. Other ❑3. PLASTIC COMPATIBLE W/CONTENTS [38.FLEXIBLE(HDPE) El 99. OTHER <br /> 94. <br /> 4. FIBERGLASS ❑9.CATHODIC PROTECTION <br /> FIBERGLASS ❑S.FLEXIBLE(HDPE) ❑ 465 <br /> ❑5.STEEL W/COATING [19.CATHODIC PROTECTION <br /> 464 C15. STEEL W�COATING ❑95.UNKNOWN <br /> VII.PIPING LEAK DETECTION(Check all that a I)A desert nor..of the monitonn roetam shall be submitted to the local aeenc .) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING <br /> 466 SINGLE WALL PIPING a67 <br /> PRESSURIZED PIPING(Check all that apply): <br /> PRESSURIZED PIPING(Check all thatapply): <br /> H ALTO PUMP SHUT C11. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> ❑1.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WIT <br /> OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ AUOFAILURE,AND SYSTEM DISCONNECTION+ <br /> AUDIBLE AND VISUAL ALARMS. <br /> AUDIBLE AND VISUAL ALARMS. ❑2. MONTHLY 0.2 GPH TEST <br /> ❑2.MONTHLY 0.2 GPH TEST <br /> ❑3.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> El 3.ANNUAL INTEGRITY TEST(O.IGPH) <br /> [14. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS <br /> CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5.DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING C3 5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUNDPIPING): O FE SUCTION SYSTEMS 6. TRIENNIAL I(NO VALVES INTY TEST(0.1 BELOW GROUND PIPING): <br /> ❑7.SELF MONITORING <br /> [17. SELF MONITORING <br /> GRAVITY FLOW <br /> GRAVITY FLOW"(Check all that apply): <br /> ❑9.BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> [18. DAILY VISUAL MONITORING <br /> ❑9. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING <br /> SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): <br /> PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CO AR SSO US ND(Check <br /> o E)SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> L RMS AND(Check one) <br /> AUTO PUMP SHUT OFF WHEN A LEAK OCCURS a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM / b AUTO PUMP DISCONNECTION <br /> U b <br /> OFF FOR LEAKS,SYSTEt FAILURE AND SYSTEM <br /> DISCONNECTION <br /> ❑c. NO AUTO PUMP SHUT OFF ❑c NO AUTO PUMP SHUT OFF <br /> I1. NO <br /> LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT �11 AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> C1 12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) SUCTION/GRAVITY SYSTEM <br /> SUCTION/GRAVITY SYSTEM <br /> 13 <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑ . CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) <br /> EMERGENCY GENERATORS ONLY(Check all that apply) <br /> ❑ ' ❑14. CONTINUOUS SUMP SENSOR WI H AUTO PU�1P SHUT OFF <br /> 14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS <br /> AUDIBLE AND VISUAL ALARMS <br /> [:115. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW ❑15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) ❑17, DAILY VISUAL CHECK <br /> ❑17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT ❑1.FLOAT,MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4.DAILY VISUAL CHECK <br /> DATE INSTALLED 468 [3 2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5.TRENCH LINER/MONITORING 469 <br /> ONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑6.NONE <br /> ISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify that the�i o t provided herein is true and ac o the best of my knowledge. /DATE 470 <br /> ) <br /> S►GNATU O ER/O ERA <br /> 471 TITLE OF OWNE OPERATOR rx1� <br /> NAME OF OPRA R(pr't) 7r l�y /� �( <br /> l! 473 Permit Expuat on Date(For local ' only) 475 <br /> Permit Number(For local use only) - 473 Permit Approved(For local use only) <br /> UPCF(12/99 revised) 12 Formerly SWRCB Form B <br />