Laserfiche WebLink
�4 <br /> SAI 16UNTY ENVIRONMENTAL HEALT ARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1I.I�:;*- ;n <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION te s_lf f f- 4 Mot. <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 03 Nov Moe. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): P11 2: <br /> I: FACILITY INFO TION <br /> FACILITY ID#(Agency Use Only) <br /> Mos. <br /> FACILITY NAME �� Opo d v�. �_�� <br /> FACILITY SITE ADDRESS Z S 6 y,,) L.. Moa. CITY L„� C' Mos. <br /> II. EQVIP NT TEST NG FREVENTIYE' NTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): M07. <br /> III::MONITORING LOCATIONS' <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MCINITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) Mlo. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: a.DRY b.LIQUID FILLED ❑ c.UNDER PRESSURE El d.UNDER VACUUM M11. <br /> PANEL MANUFACTURER: \/-9.Q&- -<- �c� M12. MODEL#: -V-kS 3! y M13. <br /> LEAK SENSOR MANUFACTURER: M14. MODEL#(S): MI5. <br /> 2.AUTOMATIC TANK GAUGING( TG)SYSTEM USED O MONITOR SINGLE WALL TANK(Sl C D_ <br /> PANEL MANUFACTURER: `2 `� M16. MODEL#: '�v �� MI7. <br /> IN-TANK PROBE MANUFACTURER: MIB. MODEL#(S): M1 <br /> LEAK TEST FREQUENCY: [I a.CONTINUOUS ❑ b.DAILYINIGHTLY Elc.WEEKLY M-10.0. <br /> . <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify): M22. M23. <br /> g.p.h. g.p.h. ( P Y)� <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS E] b.60 HOURS M25 <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY El b.BIENNIALLY El c.OTHER(Specify): M26. � <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> M28. <br /> ❑ <br /> 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M3°. <br /> .CONTINUOUS ELECTRONIC MONIT RING OF PIPING SUMPS)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: Q M33 <br /> 9 C>� M32. MODEL#: `-a <br /> LEAK SENSOR MANUFACTURER: Mia. MODEL#(S): 5_2o&35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? -8 a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 10 a.YES ❑ b.NO M37. <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETEC <br /> MLLD MANUFACTURER(s): ��K'® M38. MODEL#(S): Ms9. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL#: Mal. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. El b.MINIMUM ANNUAL 0.1 g.p.h. Moz. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: Ela.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47. <br /> "Requires agency approval "'Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(bx3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> M48. <br /> ❑ 99.OTHER(Specify) <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />