Laserfiche WebLink
. <br /> tyOUXCts <br /> STATE OF CALIFORNIA P ° <br /> STATE WATER RESOURCES CONTROL BOARD 3 g <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> a <br /> 'C'�L IFOR HIS <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED loll( <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: '�j0 / wrr t~.t <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# 1 B. MANUFACTURED 8Y: --7d'tVS4o <br /> C. DATE INSTALLED(MO/DAY/YEAR) r&v" D. TANK CAPACITY IN GALLONS: dpi uvt;> <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C ❑ to REGULAR UNLEADED [:j 3 DIESEL ❑ 6 AVIATION GAS <br /> ❑ <br /> 1b PREMIUM UNLEADED ❑ 4 GASAHOL E] 7 METHANOL 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT tc MIDGRADE UNLEADED ❑ 5 JETFUEL ❑ 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK L��i 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLEW/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 1001/6 METHANOL? YES 2 NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> SPILL CONTAINMENT INGTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> E.SPILL AND OVERFILL,etc- DROP TUBE YES NO STRIKER PLATE YES •'' NO DISPENSER CONTAINMENT YES NCI <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A672 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)AU,;14 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION r'1'1 MECHANICAL LINE LEAK ❑2 UNE TIGHTNESS 11 3 CONTINUOUS INTERSTITIAL ❑4 ELECTRONIC UNE AUTOMATIC PUMP [:] 99 OTHER <br /> Ls7 DETECTOR TESTING MONITORING LEAK DETECTOR SHUTDOWN <br /> V.TANK LEAK DETECTION <br /> ANNUAL <br /> F-1 1 VISUAL CHECK El RECONCILIATION <br /> MANUAL INVENTORECONCIL ATION RY ❑ 3 MONITORING VADOZE ❑ 4 GAUD NGAUTOMATIC TANK ❑5 MONITORINGGROUND WATER ❑ 6 TESTINGTANK <br /> 7CONTINUMONITOR U INTERSTITIAL ❑ 8 SIR ❑ 9 TANK LY MANUAL ❑10 MO TINLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO ❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED 6 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D:# Z ; a 17 1 g i3 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT AP TION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. RM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLO1W. FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING TleDERGROUND STORAGE TANK REGULATIONS <br /> FORM 8 (6-95) <br />