Laserfiche WebLink
F. In -Trask Gauging I SIR Equipment: Chedi this box if tank gagging is used only for inventory control. <br />J heck this box if no tank gauging or Silt equipment is installed. <br />This section must be completed if in -tank gauging equipment is tised to perfonn.leak detection monitoring. <br />Q Yes Q No* I ties all input wiring bees inspected for proper entry and termination, including testing for ground faults? <br />0 Yea 10 No* I Were all tank gauging probes visually ' for damage and residue buildup? <br />❑ Yes ❑ No's I Was accuracy Of system product level readings tested? <br />❑ Yes D No's Was accuracy of system water level readings tested? <br />Yes Q No* Were all probes reinstalled properly? <br />la Yes 0 No* ik ere all items on the equipment manufacturer's maintenance checklist completed? <br />* Fu the Section H, beiosY, descxt'bc how and schen thmm defxcieades were or wM be corrected. <br />G. ]Line Leak Detectors (LLD)t 0 Check this box if LUDs are not installed. <br />complete the fW10 Ing checklist: <br />JYes :: No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ NIA (Check aU. that apply] Simulated leak rate: P 3 g:p1L; ❑. 0.I g p.h ; 010.2 g.p;h. <br />Yes ❑ No* Were all LLDs coafumed operational and accurate within regulatory requirements? <br />jk Yes <br />0 Nos' <br />Was the testing apparatus properly calibrated? <br />ca,Yes <br />0 No* <br />Q NIA <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Li res U No" kw ciectroruc L.Lvs, does the turome automaucalty strut otfiftne LLU detects a 3eAkY <br />Q NIA <br />CI Yes 0 No* For electronic €.LDs, does the turbine automalitally shut off if any portion of the monitoring system is disabled <br />Q NM oc discvtmectrrd.? <br />0 Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunction. <br />0 NIA or fails a test? <br />Q Yes 0 No's For elecb= is LLDs. have all accessible wiring connections been visually inspected? <br />0 NFA . <br />cs ❑ No* W= all items on the equipment manufacturees maintenance checklist completed? <br />isa the Section H, betc►vc, desetihe how and wbren thrse d4dad cift wets or will be correctad_ <br />kI. Comments: <br />Page of 3 OYDI <br />