Laserfiche WebLink
MONITORING SYSTEM CERTIFICATION <br />For Use By All Jurisdictions Within the Susie of Cavornia <br />Aruhority Cited: Chapter 6:7. Health and Safety Code: Chapter 16, Division 3, Title 23, California Code of Regulariow <br />This form must be used to document testing and servicing of monitoring equipment. A s=m= celcation or report must be prepared <br />for each monitoring system control panel by the technician who perforans the work. A copy of this fort must be provided to the tank <br />system owner/operator. The ownedoperator must submit a copy of this form to the local agency regulating UST systems within 30 <br />days oftest date. FLAME LIQUOR- MINI MART <br />A. General Information 1301 W. KETTLEMAN LANE <br />Facility Mame: LODI, CA 95242 _ Bldg. No.: <br />Site Address: --- ----� Zip: <br />Facility Contact Person: Contact Phone No.: f ) <br />Make/Model of Monitoring System: -I I --A rr -a (L Date of Testin Servi ' i �d 5/ll, !`� <br />- <br />B. Inventory of Equipment Tested/Certified <br />EUrt-Tank Gauging Probe. <br />Model: <br />1-1 Annular Space or Vault Sensor. <br />Model: Lt <br />`..Piping Sump / Trench SeAsor(s). <br />Model: > a <br />0 Fill Sump Scnsor(s). <br />Model: <br />(K Mechanical Line Leak Detector. <br />Model: � 4 __....� <br />0ElectronicUneLeek Detector. <br />Model: <br />0 Tank Oveffll ( f£tgh-Level Sensor. <br />Model: <br />0 Other tsnacifv eouinmerat rvne: anti <br />mrviai in .RP.rlinn F n.,a P.— 91 <br />Tank 111): Y-) ,r" c <br />ZK�n-Tank Gauging Probe. <br />&kAnnular Space or Vault Sensor. <br />9 Piping Sump / nench Sensor(s). <br />El i=zu Sump Sensor($). <br />ZMechanieal Lane Lealc Detector. <br />U Bietdzonic line Leah Detector. <br />11 Tank Overfill / High -Level Sensor. <br />Model. <br />8r 73 <br />Model: <br />4 2_:� <br />Model: <br />r& `2 <br />Modell- <br />odel:Model: <br />17 F911 Smnp Sensor(s). <br />P -Mechanical Line Irak Detector. <br />Model: <br />- a— <br />model: <br />Modol: <br />Model: <br />Q Tank Ovetfill / High -Level Sensor. Model: <br />Tank iD: 5 <br />ln-Tank Gauging Probe <br />Q.Annular Spare or Vault Sensor. <br />C.4 tD, <br />odes. -7 6 a <br />Model: 7e - <br />I Taa m: <br />❑ la -Tank Gauging Probe. Model: <br />❑. Annular Space or Vault Sensor. Model: <br />_Piping Sump / Trench Sensorls). <br />Model: , <br />D Piping Sump / Trench Sensor(s). Model: <br />17 F911 Smnp Sensor(s). <br />P -Mechanical Line Irak Detector. <br />Model: <br />Model:...?. <br />D Fill l sump Sensor(s), Model: <br />D Mechanical bine Leak Detector. Model: <br />Q Elccuottic lane Leak Detector. <br />Modol: <br />Q Blectmnic Line Leak Detector. Model: <br />Q Tank Ovetfill / High -Level Sensor. Model: <br />13 Tank Overfill ./ ugh -Level Sensor. Model- <br />Q Other t and model in Section E on 2). <br />Q other a r» and epode! in Section E on LaLe 2). <br />Dispenser ®: <br />DispenserID: , <br />QDispenser Containment Sensor(s). <br />Model <br /><] Dispenser Containment Sensor(s). Model: <br />Shear Valve(s). <br />W Shear Valve(s). <br />Die ser containment F7oat(s and Chain(s). <br />10 Di sea Containment Float(s) and Chains L_ <br />Dispenser- ID: <br />Dispenser ID: <br />Q Dispenser Containment Sensor(s)_ <br />Model: <br />Q Dispenser Containment Sensor(s). Model: <br />El shear valve(s). <br />� Shear V.)V a(s). <br />D; ser Containment Fl s) and Chain(s). <br />Containment Float(s) and Chain(s). <br />Dispenser ID: I TH ID. <br />Q Dispenses Contaitunent Sensor(s). Model: ❑ Disp-, — Containment Sensor(s), Model: <br />U Shear Valve(s). O Shear Vaive(s). <br />QDisDenw Contaiatment Foat(s) and Chain & Q D` ser Cantaimueat Haat(s) and Clrain(s). <br />*If the facility contains more tanks or dispensers, copy this forret. Include information for every tank and dispenser at the facility, <br />C. Certification -I certify that the equipment identified in this document xas inspected/serviced In accordance with the manufacturers, <br />guidelines. Attached to this Certincadon Is information (". m mufgciarcrs- cheddIM) neogmary to verify that this i[Se utation is <br />correct and a Plot Pian showing the layout of monitoring egapmenL For anyequipment fible of generating such reports, I have also <br />attached a copy of the report; (check ani fhb ly): d4ystem set-up Ala t Itt r report <br />Technician Mame (print). i. ( (C2 11 Z. Signature: <br />Certification No.: (. 7 2) 'c' License. No.: `1) ,: `-" <br />Testing Company Name: Z 77-6 Phone <br />Site Address: 1301 Vr -telC&IDaae of`Tesiirrg/Servicing: ' <br />rag 1 of 3 03!01 <br />Monitoring System Certification <br />