My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1301
>
2300 - Underground Storage Tank Program
>
PR0231342
>
COMPLIANCE INFO_1999-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 3:26:07 PM
Creation date
6/3/2020 9:46:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2009
RECORD_ID
PR0231342
PE
2361
FACILITY_ID
FA0000392
FACILITY_NAME
FLAMES LIQUOR
STREET_NUMBER
1301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104030
CURRENT_STATUS
01
SITE_LOCATION
1301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231342_1301 W KETTLEMAN_1999-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPENSER i T (UDC) TESTING <br />TGStetitOC� By: Manufacturer • lndustry Standard 0 Professional Engr, ©Other (see below) <br />Test MethodUses: C3 Pressure p Vacuum *::Hy rom.airic4 Other (see below) <br />Measuring Equipment Used: Leuel Change Indicator {Caldwell System 2001 / Walton Engineering) <br />DScriptitfrl DiSp;# 1/2 Disp # 3/4: ............. <br /># 5/6 Disp # /& <br />UDC Manufacturer <br />Bravo <br />Bravo <br />Bravo <br />Bravo <br />UDC Material <br />Steel <br />Steel <br />Steel <br />Steel <br />UDC Depth (inches) <br />9" <br />9" <br />9" <br />9" <br />Height from UDC bottom to highest <br />Bottom <br />Bottom <br />Bottom <br />Bottom <br />piping penetration <br />Height from UDC bottom to lowest <br />Bottom <br />Bottom <br />Bottom <br />Bottom <br />electrical penetration <br />Condition of UDC prior to testing <br />Dry <br />Dry <br />Dry <br />Dry <br />Portion of UDC tested <br />Entire <br />Entire <br />Entire <br />Entire <br />Type of shut -down present <br />Float <br />Float <br />Float <br />Float <br />Was sensor removed for testing? <br />N/A <br />N/A <br />N/A <br />N/A <br />Was sensor properly replaced after testing? <br />N/A <br />N/A <br />N/A <br />N/A <br />Wait time for water level to stabilize (hr:min) <br />0:17 <br />0:17 <br />0:17 <br />0:17 <br />Depth of water level from UDC bottom (in.) <br />6" <br />6" <br />6" <br />6" <br />Test start time <br />9:03 AM <br />9:04 AM <br />9:05 AM <br />9:06 AM <br />Test end time <br />X. 9:33 AM <br />9:34 AM <br />9:35 AM <br />9:36 AM <br />Test duration (hr:min) <br />0:30 <br />0:30 <br />0:30 <br />0:30 <br />Change in water level (± 0.000 inches) <br />0.000 <br />0.000 <br />0.000 <br />0.000 <br />Pass/Fail threshold (0.005 inches / %: Hr.) <br />0.005 <br />0.005 <br />0.005 <br />0.005 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />PASS <br />Comments: <br />© 2002 Walton Engineering, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.