My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1301
>
2300 - Underground Storage Tank Program
>
PR0231342
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 4:04:58 PM
Creation date
6/3/2020 9:46:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231342
PE
2361
FACILITY_ID
FA0000392
FACILITY_NAME
FLAMES LIQUOR
STREET_NUMBER
1301
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
03104030
CURRENT_STATUS
01
SITE_LOCATION
1301 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231342_1301 W KETTLEMAN_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page of <br />Secondary Containment Testing Report Form <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />FACILITY INFORMATION <br />Facility Name: Flame Liquor & Gas Date of Testing: 11/17/2011 <br />Facility Address: 1301 West Kettleman Lane, Lodi, Ca. 95242 <br />Facility Contact: Rupi I Phone: (209) 334-3233 <br />Date Local Agency Was Notified of Testing: 10/24/11 by Afford -A -Test -11/16/11 for date change <br />Name of Local Agency Inspector (fpresent during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: R&D Compliance Testing <br />Technician Conducting Test: Benjamin F. Duncan Jr. <br />Credentials: ❑ CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br />License Type: Tank Tester License Number: 90-1120/ICC #5246802 -UT <br />Manufacturer Training <br />Manufacturer Component(s) Date Training Expires <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied and recovered for reuse by, R&D Compliance Testing. <br />Note: Original test date of 11/21/2011, changed to 11/17/2011. Ok per Local CUPA. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature:Wyyawff��iaJr Date: November 17, 2011 <br />3. SUMMARY OF TEST <br />RESULTS <br />Component <br />Pass <br />Fail <br />Tested <br />Not <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Annular Tank #I <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Annular Tank #2&3 <br />X <br />❑ <br />❑ <br />0 <br />❑ <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #I <br />X <br />❑ <br />0 <br />❑ <br />❑ 1 <br />0 <br />❑ <br />0 <br />Secondary Pipe #2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />1 ❑ <br />Secondary Pipe #3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Piping Sump #1 <br />X <br />❑ <br />❑ <br />❑ <br />0 <br />0 <br />❑ <br />❑ <br />Piping Sump #2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ 1 <br />❑ <br />❑ <br />❑ <br />Piping Sump #3 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump # 1 &2 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />0 <br />0 <br />❑ <br />Dispenser Sump #3&4 <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #5&6 <br />X 1 <br />❑ <br />❑ <br />❑ <br />1 <br />❑ <br />❑ <br />❑ <br />❑ <br />Dispenser Sump #7&8 <br />X I <br />❑ <br />❑ <br />❑ <br />I <br />I ❑ <br />❑ <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Test Fluid Supplied and recovered for reuse by, R&D Compliance Testing. <br />Note: Original test date of 11/21/2011, changed to 11/17/2011. Ok per Local CUPA. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature:Wyyawff��iaJr Date: November 17, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.