Laserfiche WebLink
,10. <br />0 <br />.j?XN <br />O0> <br />Z (D 0 <br />7 � N _ <br />O <br />7 > 0 < <br />ITT <br />0 <br />N <br />0 <br />4 <br />N <br />to <br />>1 <br />14. <br />' Sstc C ori � / — �i q �/O,L 71'%Pisao .? L..t?! / �A• �� S�'— �7 � <br />Name of Supolist. Owner of Dealet Address No. and Sneet(s) City State Date of Test <br />b 15. TANK TO TEST 16. CAPACITY <br />Z ID <br />"t Y Nominal Capacity /Z a O n <br />Ln ® Identity by position Gallons <br />A� I Is there doubt as to True Capacity? ❑ <br />Stand and Grade See Section "DETERMINING TANK CAPACITY" <br />EF EST <br />v <br />Stick Water Bottom. n <br />F f FF.W. p <br />AUG90 % in. Gallons <br />From <br />Station Chan <br />By most accurate <br />capacity chart available�2 ❑ Tank Manufacturer's Chart <br />Gallons ❑ Company Engineering Data <br />❑ Charts supplied with P+40Tl e <br />❑ Other <br />Slick Readings Total Gallons <br />to W In. Gallons on. Reading <br />Inventory SLA rI AENV <br />t -p l ROMENtjEt1 S E AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY 8 <br />Tank Diameter 9s Product In full tank (up to fill pipe) I <br />o�s�• �*pr Ens' � 6a.'d .. <br />® 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK o �Sv 750 • VAPOR RECOVERY SYSTEM <br />sM <br />See manual sections applicable. Check below and record procedure in log (26). Cpt2✓t . �a 6-a-4,1. �j$� ® — <br />Stage I <br />❑ Water in tank ® High water table in tank excavation ❑ Line(s) being tested with LVLLT [Stage 11 <br />19. TANK MEASUREMENTS FOR <br />TSTT ASSEMBLY <br />Bottom of tank to Grade* " <br />Add 30" for 4" L <br />Add 24" for 3" L or air seal ....... <br />Total tubing to assemble Approximate ......... " <br />20. EXTENSION HOSE SETTING <br />Tank top to grade' .................................. tt <br />Extend hose on suction tube 0" or more <br />below tank top ..................................... - ,r <br />'If Fill pipe extends above grade, use top of fill. <br />21. TEMPERATURENOLUME FACTOR (a) TO TEST THIS TANK <br />Is Today Warmer? 13 Colder? (3 F Product in Tank _• F Fill -up Product on Truck F Expected Change ( + or — ) <br />22. Thermal -Sensor reading after circulation /S 77 In /� / _'F <br />3 digits, Nearest <br />23• Digits per *F in range of expected change / -Y <br />digits ...._ <br />24.total 4 Q xH6 C�9 / ,n rr // _ 7 . 0 g y 9i7 7 gallons <br />quantity expansion for ` .volume change in this tank <br />full tank (16 or <br />17) Involved product per •F <br />�� <br />25. ? `� 5 IV $71 ;. / / s 6 :2 a j IC 5"2 This Is <br />volume change per °F (24) Digits per °F in test, Volume change per digit test <br />Range (23) Compute to 4 decimal places. factor (a) <br />26. <br />LOG OF TEST PROCEDURES <br />30. HYDROSTATIC 31. <br />PRESSURE <br />CONTROL <br />VOLUME MEASUREMENTS M <br />RECORD TO 101 CAL <br />. <br />34. <br />38.NET VOLUME 39. --" <br />TEMPERATURE COMPENSATION CHANGES ACCUMULATED <br />USE FACTOR b) CHANGE <br />EACH READING ) <br />27. <br />DOE <br />TIME <br />(74 kJ <br />28. <br />Record details of setting up <br />and running test. (Use full <br />length of line if needed.) <br />29. <br />AaaMnt <br />No. <br />Sundpipa Leval 32. Product is <br />in Inches <br />Graduate. <br />Beginning Leval to <br />of wh'uh before After <br />Reading Restated Reading:. Reading <br />Product <br />Replaced (—) <br />Product <br />Recovered (+) <br />35' <br />Thermal <br />Sensor <br />Reading <br />Change <br />Higher + <br />Lower — <br />(e) . <br />Temptuature <br />Adjustment <br />Immputation 1 <br />(c) x (a) . volume AIS <br />Expansion + <br />Contraction (+) °P <br />Contraction — Caltraaan (—) <br />®33(V) --®37(T) <br />M NO LeW Wastes" <br />TetN Ead <br />At Lou Lobi saayaao <br />Cswge i* Wat } <br />OIFPA } <br />D <br />'i <br />I <br />.1i `o <br />/ i•ur <br />IF J <br />-z ti <br />, r 4 t-iteJI pro <br />412. <br />to <br />0o <br />a. 12l / `� <br />Z <br />/ <br />d <br />206 <br />16/57 <br />J1 <br />11 <br />401q <br />s <br />Lt, / :&5LOO>4 <br />bN <br />4 <br />203 - p <br />30 <br />« A <br />yS o <br />1.60 C) <br />150 <br />K1' I <br />�61 s <br />f,3 <br />4100 <br />ill <br />uQn <br />yy g <br />z <br />17 o <br />Z07 <br />4- <br />4z 61 -r- <br />L"7 <br />"7 <br />11W <br />rte z <br />� l30 <br />1,13 <br />iy30 <br />yy <br />. 7S0 <br />5r, <br />4160 <br />zr9 <br />4,1_ <br />4,(3e--- <br />6-3C <br />/V>s <br />z _-75® <br />/-coo <br />-� So <br />zz <br />z0 <br />-a <br />Jr- _/ <br />► <br />-z <br />z <br />6 <br />-A14 6 <br />4100 <br />Z z -5 <br />- S <br />-- -} z i <br />�si5 <br />I <br />-z� <br />-� g <br />, Zey <br />®® <br />153° <br />�4­ <br />/y <br />�z <br />• CS <br />;may <br />-f tfe <br />y <br />41' <br />'Z <br />CC <br />o <br />�, e <br />