Laserfiche WebLink
(Submit minimum of 3 sets of plans & applications as originals will b. eMd by EHD) <br />1. Site map enclosed? YES NO VOONMENTAL HEALTH <br />DEPARTMENT <br />2. Submit copies of ICC service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the LIST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Sawcut concrete 7x7on the existing 87 main turbine sump. Remove existing turbine & install 2 turbines <br />in the 87 tank & replace the existing turbine in the 91. Replace existing MLD's with new FE Petro, Model <br />#443168901 STP -MLD Mechanical Leak Detectors for existing UST's. Install Bravo RC -Series Snap -Lock Sump <br />Lid on the 87 STP Sump. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />FE Petro, Model #443168901 STP -MLD Mechanical Leak Detectors <br />Bravo RC -Series Snap -Lock Sump Lid <br />