Laserfiche WebLink
Veeder-Root Line Leak Applicon Guide <br />MAXXUM PUMPS <br />1. Thread the DPLLD or PLLD transducer into the 2 -inch opening of the transducer port. <br />QIMPORTANT! Seal any pipe threads using a UL -classified, non-toxic pipe sealant suitable for the fuel involved. <br />2. If any in-line check valves or a Big -Flo Diaphragm Valve are installed in the line, they must be removed. <br />3. Verify that the TLS 350 Series Console has Version x19 or later software (TLS -450 Series Consoles Version 1 or later <br />software). <br />Junction box Seal -off, epoxy seal per NFPA spec <br />(customer supplied) (customer supplied) <br />DPLLD or Pl <br />transducer 1 <br />Transducer <br />port <br />conduit to console <br />(customer supplied) <br />Nld\maxxum.eps <br />FE PETRO HIGH CAPACITY PUMPS <br />1. Install a reducing tee (customer supplied) in either of the 3 -inch discharge ports of the pump with the 2 -inch port facing up. <br />2. Thread the D/PLLD transducer into the 2 -inch port on the tee fitting. <br />QIMPORTANT! Seal any pipe threads using a UL -classified, non-toxic pipe sealant suitable for the fuel involved. <br />3. Install a model "R" relief valve into the pump if one is not already present. <br />13 <br />