My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2023 4:05:16 PM
Creation date
6/3/2020 9:47:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231346_401 W KETTLEMAN_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
620
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Time In: <br /> Time Out: <br /> 141 San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)464-0138 Web:www.sogov.org/ehd <br /> Underground Storage Tank Program Service Request Inspection Report <br /> Name of Facility: TESORO(MOBIL)68152 Date: 12/19/2018 <br /> Address: 401 W KETTLEMAN LN LODI 95240 <br /> Requestor: MICHAEL WALTON,WALTON ENGINEERING Telephone: (916)373-1165 <br /> Program Element: 2308-UST RETROFIT Request#: SR0079789 <br /> Inspection Type: 298-UST RETROFIT REPAIR INSPECTION <br /> Onsite Service Technician: Rey Hernandez ICC Service Tech/Installer Exp. Date: 05/08/2019 <br /> Manufacturer training: OPW, 01/01/19 <br /> *=w. OVERAII ISPEGT�O�[ l! IIS AND COMMENTS <br /> NOTES <br /> On site to verify corrosion protection for the 91 product direct bury spill container prior to backfilling. The riser pipe was coated <br /> with 2 inch, 20 mil tape to protect it from the backfill,the rest of the spill container meets corrosion protection by isolation due <br /> to the material of the outside of the container. Measurement of the Overfill prevention was verified to be set at 95%of the tank <br /> volume. Ball floats were removed from the vent lines to ensure that they do not interfere with the installed flapper valve. <br /> This service request is not completed at this time.A verification of a minimum 5 gallon capacity, a one hour hydrostatic test(or <br /> equivalent)along with proper drainage, and secondary containment testing on the 91 product tank must be verify in order for <br /> the facility to receive 91 product fuel. <br /> An inspection to complete the service request is schedule for 12/20/18 at I lam. <br /> The person in charge is responsible for ensuring that the above mentioned facility is in compliance with all applicable sections of the California Health and <br /> Safety Code.If a reinspection is required,fees will be assessed at the current hourly rate. <br /> Received by: Z j Name and Title: Rey M Hernandez, Service Technicia <br /> EH Specialist: ZUNA BARKER Phone: (209)953-7311 <br /> FA0003603 SR0079789 SC298 12/19/2018 <br /> EHD 23-01 Rev.06/30/15 Page 1 of 1 Underground Storage Tank Program Service Request Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.