My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
601
>
2300 - Underground Storage Tank Program
>
PR0231348
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 9:41:51 AM
Creation date
6/3/2020 9:47:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231348
PE
2361
FACILITY_ID
FA0003803
FACILITY_NAME
KETTLEMAN CHEVRON
STREET_NUMBER
601
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04728006
CURRENT_STATUS
01
SITE_LOCATION
601 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231348_601 E KETTLEMAN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page of <br />Test Method Developed By: <br />X Piping Manufacturer ❑ Industry Standard <br />❑ Other (Spec) <br />❑ Professional Engineer <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping Run # 1 <br />Piping Run # 2 <br />Equipment Resolution: 1/10-15 Psi <br />MMMMIMBROM <br />Piping Run # 3 Piping Run # 4 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 210' <br />Approx. 200' <br />Approx. 200' <br />Approx. 110' <br />Product Stored: <br />Super 91 <br />Regular 87 <br />Regular 87 <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at <br />UDC#3&4 <br />Test boot at <br />UDC#3&4 <br />Test boot at <br />UDC#3&4 <br />Test boot at STP #4 <br />Wait time between applying <br />pressure and starting test: <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />Test Start Time: <br />9:55 <br />9:45 <br />9:35 <br />9:20 <br />Initial Reading (RI): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />10:55 <br />10:45 <br />10:35 <br />10:20 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />i Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />No loss in Psi <br />Test Result: <br />I X Pass ©,Fail <br />X Pass 0 Fail <br />I X Pass ❑ Fail I X'Pass 0 Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up <br />for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.