My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
601
>
2300 - Underground Storage Tank Program
>
PR0231348
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 9:41:51 AM
Creation date
6/3/2020 9:47:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231348
PE
2361
FACILITY_ID
FA0003803
FACILITY_NAME
KETTLEMAN CHEVRON
STREET_NUMBER
601
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04728006
CURRENT_STATUS
01
SITE_LOCATION
601 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231348_601 E KETTLEMAN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />9. FILL RISER CONTAINMENT SUMP TESTING <br />Facility is Not Equipped With Fill Riser Containment Sumps <br />Fill Riser Containment Sumps are Present, but were Not Tested X <br />Test Method Developed By: <br />❑ Sump Manufacturer <br />❑ Other (Spec) <br />❑ Industry Standard ❑ Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: <br />Sum Diameter: <br />Fill Sump # <br />Equipment Resolution: <br />MEMEMEMEMEEM <br />Fill Sump # Fill Sump # Fill Sump # <br />Sum Depth: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested <br />Sump Material: <br />Wait time between applying <br />water and starting test: <br />Test Start Time: <br />Initial Reading (RI): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF—RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result:. <br />❑ Pass' . ❑ Fail <br />❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />Is there a sensor in the sump? <br />❑ Yes No <br />❑ Yes No ❑ Yes No ❑ Yes ❑ No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />❑ Yes []No NA <br />❑ Yes ❑ No NA ❑ Yes ❑ No NA ❑ Yes ❑ No ❑ NA <br />Was sensor removed for testing? <br />❑ Yes []No NNA0 <br />❑ Yes ❑ No -NA ❑ Yes El No NA 11 Yes L1 No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />❑ Yes ❑ No <br />Yes ❑ No NA ❑ Yes ❑ No NA ❑ Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.