Laserfiche WebLink
og'qu ly c <br />?• �E�' P SAN JOAQUIN COUNTY <br />. { ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/e <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facili�lt:i%ii'� <br />Inspection Date: <br />,,� <br />Facility Address: <br />(sol / CA 13X <br />Service Request #: <br />607-76 <br />Onsite Service Technician's <br />Name: <br />ICC Service Technician/Installer Exp. Date: <br />361 � 2012 <br />Manufa turer Training: &P <br />��� �!� <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />Q <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ <br />❑ fail safe Serial #: <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />SERVICE <br />C� <br />Mill bucket k minimum 5 gallon <br />R9 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />V1\ pill bucket t9minimum 5 gallon <br />® 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />LIDC(s) Piping <br />Sump(s) UST(s) <br />Q <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />Other: see below <br />DIRK, <br />flll ' l <br />/ <br />Rec <br />EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br />Rev 11/17//08 <br />