Laserfiche WebLink
. i <br />SW-kC9, January 2002 9 Page Of <br />Secondary Containment Testing Report <br />Form <br />This form is intended for use by contractors performing periodic testing of UST secondary contTmenfttems�� <br />�,� �t� e <br />s, roc d e� <br />appropriate pages of this form to report results for all components tested. The completed for n stRroced el nd <br />--prinrvv,-a-fromlests-(�'�* 171 -e) -, -should beprovided-to-lhefacility owner/operator for" -sub i VC�N4�di�g <br />1. FACILITY INFORMATION <br />Facility Name: S-riv- <br />Pass <br />Date of Testing: <br />Facility Address: to 0 1 <br />Repairs Component <br />Made <br />Facility Contact: —i o <br />Phone: 3 3 o,3, c) 'S - <br />Date Local Agency Was gotified 4Testing: <br />Repairs <br />Made <br />Name of Local Agency Inspector (ifpresent during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs Component <br />Made <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />1 et <br />El <br />11 <br />[I <br />El <br />11 <br />El <br />Tfl:; <br />El <br />n <br />0 <br />0 <br />❑ <br />Jj <br />El <br />0 <br />0 <br />v/ <br />11 <br />El <br />[1 <br />0 <br />0 <br />V <br />71 <br />p I <br />If hydrostatic testing4as performed, describe what was done with the water after completion of tests: <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in hrdffd� cumenl are accurate and in full compliance with legal requirements <br />rechnician's Signature:, Date: <br />C-" <br />