My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
601
>
2300 - Underground Storage Tank Program
>
PR0231348
>
COMPLIANCE INFO_2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 9:41:51 AM
Creation date
6/3/2020 9:47:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231348
PE
2361
FACILITY_ID
FA0003803
FACILITY_NAME
KETTLEMAN CHEVRON
STREET_NUMBER
601
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04728006
CURRENT_STATUS
01
SITE_LOCATION
601 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231348_601 E KETTLEMAN_2006-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L' <br />waxpit, 6kdzz-" t' <br />m <br />2 INSTALLATION <br />2.1 Inspect the Equipments , <br />Examine the shipment immedi telt' upon arrival to make certain there has been no damage or loss in <br />transit. Make sure that all the component parts, including keys and optional equipment (if any), are <br />accounted for. Check and save the Packing Slip, Bill of Lading, Invoice, and all other documents <br />included in the shipment. Damaged or lost equipment must be reported to the carrier. Any damage or <br />loss that may occur in transit is not covered under the Wayne/Dresser Warranty. <br />2.2 Island Construction, Dispenser Anchoring, and Piping <br />Product lines must avoid the creation of vapor in the lines and deliver a minimum pressure of 25 psi at <br />the dispenser inlet when all dispensers at the station dispensing the same product are operating. <br />A concrete foundation must be provided for the dispenser. Do not pour concrete around product lines or <br />electrical conduit risers. <br />Anchor bolts must be installed in the island to allow the dispenser to be bolted down in accordance with <br />NFPA requirements. The base of the dispenser contains six bolt hole slots (5/8 inch by 2 inch) for <br />anchoring the dispenser to the island. Use of all anchoring locations is re -commended. Position <br />the anchor bolts in accordance with the dimensions shown on the Installation Instruction drawing for the <br />dispenser model. These drawings are located in Appendix B. <br />Vertical supply risers and electrical conduits must be located per the Installation Instruction for the <br />appropriate model. Proper height must be maintained to avoid undue stress on the dispenser. <br />For E85 Ovation models, product piping, pipe nipples, etc., containing Ethanol fuel must be Ethanol <br />compatible. See the information in Section 1.1 on page 1. <br />For convenience, a 6" high pedestal is available to install under the dispenser base at locations where <br />there are no islands. The pedestal, shown in Figure 2-1, can be ordered separately. See the complete <br />assembly drawing 888813 in Appendix B. <br />Figure 2-1 Pedestal. The pedestal can be ordered separately as needed. <br />February 2008 Part No. 920559 Rev F <br />
The URL can be used to link to this page
Your browser does not support the video tag.