My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:27:51 PM
Creation date
6/3/2020 9:47:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page '-7 -of <br /> 4, TANK ANNULAR TESTING <br /> Test Method Developed By: Anank Manufacturer U Industry SWWatd U Professional Engineer <br /> Ll Other(Specify) <br /> Test Method Used: U Pressure Vacuum U Hydrostatic <br /> U Other,fSpeei } <br /> Test Equipment Used:VaLt L V k c414k 64 . Equipment Resolution � (� --3b <br /> Tank#j Tank 91 g 7 Tank# Tank# <br /> Tank From Testing?' U Yes o U Yes o U Yea U o U Yes U o <br /> Tank Capacity: 10. 000 Io w-5 , - 5 <br /> Tank Material: <br /> Tank Manufacturer: <br /> Product Stored: Vll�✓ `,3'a– SU JVV <br /> Wait time between applying <br /> pres water and <br /> L i�b,tir <br /> Test Start Tin= <br /> Initial Reading(RQ: <br /> Test End Time: 10 <br /> Final Reading(RF): <br /> Test Duration: b <br /> Change in Reading(RF-Ri). 1pv o <br /> Pas&Tail Threshold or Criteria: H1O MY Volvo W <br /> N A t yy yr <br /> Was sensor removed for testing? es U No U NA es U No U NA U Yes JUNIO U NA U Yes U NA <br /> Was sensorproperly replaced and es U No U NA U No U AIA U Yes U No U AIA U Yes No U NA <br /> verified fumctional after res ' ? <br /> Comments–(wdude informadm on repairs made prior to testvi�and raecomrruended follow-up�orfWed tests) <br /> Secondary containment systems where the continuous manitoring automatically momitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.