Laserfiche WebLink
t <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK NfONTI ORD G PROGRk�1 <br /> This monitoring program must be kept at the QST location at all ties. i fie information on -his mcrito::-? <br /> program are conditions of the operating permit. 7ne permit holder roust notify San Joaquin Counry <br /> Environmental Health Division, phone (209) JO days of anv changes to the mcnitcrir._ <br /> procedure::, unless required to obtain approval before maldng the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> r <br /> Facility Name <br /> Facility Address ;x i✓.: i_�K�` �' %-�% �'0 <br /> .x <br /> A. Describe the frequency oferfotmina the mcnitors;lg: <br /> Tank C�p X/ <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used fcr. <br /> performing the monitoring: <br /> Tank 1 til <br /> Piping <br /> C. Describe the lecation(s) where the monitcrung will be perforu,ed (facility plot r i-- <br /> should be attached): <br /> D. List the names) and title(s) of the people responsible for per,.o=ing the monitc <br /> and/or maintaining the equipment: <br /> �1 t_ <br /> I <br /> f <br /> E. Reporting format for monitoring- <br /> Tank VY <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. N ore: <br /> Maintenance must be in accordance with the manufacturers' maintenance sche-. ule <br /> but not less than every 12 months: <br /> G. Describe the training necessary for the operation of UST system, including piFing, <br /> and the monitoring equipment <br /> F a u <br />