Laserfiche WebLink
0 9 <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK NfONI i iORRgG PROGRAM <br /> "This monitoring program must be kept at the UST location at all times. T'ne information on this monitorna <br /> program are conditions of the operating per-Mit. The pe.^.mt holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 463-3420 within 30 days of any changes to a mer.:t0rin? <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR. <br /> Facility Name <br /> Facility Address ;x <br /> A. Describe the frequency of erforming the morutor7,ug: <br /> Tank <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used -',:Cr <br /> performing the monitoring: <br /> Tank <br /> Piping <br /> C. Describe the locations) where the monitoring will be performed (facility plot pian <br /> should be attached): <br /> .�C',C <br /> D. List the name(s) and title(s) of the people responsible for performing the monitcr'-g <br /> and/or maintaining the equipment: <br /> Z- <br /> E. Reporting format for monitoring* <br /> Tank <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. vte: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: <br /> Al <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: <br /> I \�� <br />