My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:27:51 PM
Creation date
6/3/2020 9:47:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The FE Petro STP -MLD leak <br />detector is a three position, pressure - <br />sensing, piston operated valve <br />designed to continuously monitor the <br />piping by indicating any leakage in the <br />piping between the discharge and the <br />submersible pump and the solenoid <br />valve in a service station dispenser. <br />When the submerged pump is <br />turned on after the system pressure <br />has dropped significantly below the <br />normal static system pressure, three <br />GPH (at 10 psi) is metered through the <br />STP -MLD into the piping system. If a <br />leak is present that equals or exceeds <br />this amount, as much product escapes <br />from the system as is metered through <br />the STP -MLD. Under this condition, <br />pressure cannot build up in the piping <br />system. When a nozzle is opened, a <br />poppet in the STP -MLD moves to a <br />position that restricts the flow to 2 <br />GPM. This is the indication to the <br />operator that a leak is present. If <br />there are no leaks, pressure rapidly <br />builds in the system forcing the <br />STP -MLD to open to the full -flow <br />position. In a system with no leaks, it <br />takes approximately three seconds for <br />a complete test. No further line testing <br />takes place until the line pressure <br />drops significantly below the normal <br />static system pressure. <br />v <br />1. The Tripped or Bottom 2. Leak Sensing Position 3. Non -Leak or Full Flow <br />Position In this position the system pressure Position <br />When the system is less than 1 psi, the has increased to approximately 12 psi This position allows full flow. The <br />piston and poppet are in the and all the flow must travel around poppet will remain in approximately <br />"bottom" or "tripped" position. In this the metering pin which limits it to this position as long as the system <br />position of the poppet, product flows approximately a 3 GPH rate (at 10 psi). pressure remains at about the <br />through the horizontal hole in the pop- If there is a leak in the system which pumping pressure. If the pressure in <br />pet and around the metering pin at a will allow leakage to exceed this amount, the system drops when the pump is <br />rate of approximately 2 GPM the line pressure will not build beyond turned off, either due to thermal <br />flow into the delivery line when the this point and the valve will remain in contraction of the product or due to a <br />submersible pump is running. In the leak sensing position with the main leak, the piston moves downward and <br />normal operations the piping remains flow blocked. If there is an attempt to the poppet engages and seals inside <br />full of fluid and when the submersible dispense while the valve is in this posi- the cage at about 3 psi, or approxi - <br />pump is turned on, with a flow rate of tion, the line pressure will drop to less mately 10 feet of head, in gasoline. <br />2 GPM through the poppet, pressure than 1 psi, the piston will respond, and Any time the pump is turned on after <br />builds rapidly and the poppet moves to the poppet will return to Position 1 the seal on the poppet is inside the <br />the leak sensing position. where 2 GPM will flow to the dispensers. cage, a line test will be performed. <br />Leaks smaller than 3 GPH will be indi- <br />cated by the STP -MLD taking longer <br />than three seconds to open completely <br />because some of the flow leaks out of <br />the system and the rest builds pressure. — _ _ _ = <br />r <br />If there is no leakage in the system, f <br />the small flow around the metering pin FE Petro, Inc. ■ 4805 Voges Road `— <br />increases the line pressure and in P.O. Box 139 ■ McFarland, WI 53558 <br />approximately three seconds the piston (608) 838-8786 ■ Fax: (608) 838-6433 <br />will move the poppet to Position 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.