My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:27:51 PM
Creation date
6/3/2020 9:47:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III <br />50 <br />All <br />PETROFLEXIRI- <br />2000 Vapor <br />Recovery Hose <br />- UL330 <br />With Venturi Device <br />shies 75743TF* * <br />Important: Refer to page 94 for safety information regar- <br />ding the use of this hose. This specially designed <br />system, a hose within a hose, is for gasoline <br />dispensers where compliance with Environmental <br />Protection Agency (EPA) Stage II vapor recovery is <br />required. Lightweight, flexible and easy to handle, <br />weighing about the same as a conventional 1/4 in. <br />hose. The. -couplings mate with all known OEM <br />dispensers and nozzles. California State Fire Marshall, <br />California Air Resources Board (CARB), and Dept. of <br />Weights and Measures approved. Is covered by one or <br />more U.S. patents and pending applications. The pro- <br />duct hose includes a venturi device which <br />automatically evacuates liquid from the vapor passage <br />during the fueling process. Comes standard with anti- <br />theft nuts. <br />For non -Venturi Model see Series 7574BTN <br />Inner Hose <br />Tube: Black synthetic rubber <br />Cover: Black synthetic rubber <br />Reinforcement: One textile braid with static wire <br />Outer Hose <br />Tube: Black TPR <br />Cover: Black TPR <br />Reinforcement: Helix wire encapsulated in TPR <br />**Venturi location in number of inches from nozzle end <br />Lengths: Assemblies only <br />Fittings: Special PETROFLEX vapor recovery <br />couplings 17/e in. - 12UN-2A threads - no <br />maintenance required <br />Clamps: Special Dayco retractor cable hose <br />clamp 7658-0017 (Refer to Couplings <br />Section, page 86) <br />• <br />Inner <br />Outer <br />System <br />Hose I.D. <br />Hose 1.D. <br />O.D. <br />Approx. Wt. <br />Max Recom. <br />Part No. <br />(in.) <br />(in.) <br />(in.) <br />Per Ft. <br />WP(PSI) <br />7574BTF**- <br />5/e <br />1% <br />1.70 <br />.51bs. <br />150 <br />inrhpc of Ipnnth <br />**Venturi location in number of inches from nozzle end <br />Lengths: Assemblies only <br />Fittings: Special PETROFLEX vapor recovery <br />couplings 17/e in. - 12UN-2A threads - no <br />maintenance required <br />Clamps: Special Dayco retractor cable hose <br />clamp 7658-0017 (Refer to Couplings <br />Section, page 86) <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.