Laserfiche WebLink
LIST SYSU101 DRAWING INFORMATION <br />1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipmtht to be installed). <br />2. y- Plans drawn to stale in non-erssebta print. <br />3. Plot plan to show Location of tanks and all associated piping. <br />4. —A--" Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />S. !-l"' Tank cross-sectionst diagram. <br />6. ✓ actoil of tank, associated piping, excavation and cover. <br />Tenk(a) and piping approved by a nationally recognized independent testing organization: (titte 23, Chapter 16, <br />/ Artiete 3. Section 2631 (b) 6 26351 <br />d. t� verification of product compatibility with the tank($), piping, monitoring - <br />device(s), epoxy or silicons glues. etc. <br />9. V" Manufacturer's written installation instructions for tank(s)e piping, monitoring devices, etc. <br />10. f! At tha insteltation site, prior to installation, a tightness test shell be performed on both primary (10) and <br />secondary (29) containment systems before covering. (Section 2635 (a) (3) a (01 <br />IT. Tank Integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to PHS -ENO from the testing company or owner of facility. (Health S Safety Code, Division 20, <br />chapter 6.7, Section 25241 (h)) <br />12. TANK COMPOS i T 1 Ott <br />TANK N <br />N <br />N9: N a N <br />CAPACITY <br />d ele& <br />5 elel tjtereJ <br />imp <br />O DS <br />�C <br />MANUFACTURER <br />J .1.n A <br />1tI0N <br />`; f�`'� <br />iEe <br />!YODEL <br />G J Z Z' <br />S Z 26 S Z Z. <br />PRODUCT <br />CORROSION PROTECTION <br />?::t ex 64 <br />A`-SEft6As5 f /�p�ca'teff <br />U.L. LISTED <br />(0 <br />1-2 4A <br />COMPATIBILITY WITH 100% <br />110,5METHANOL <br />S /E'S <br />13. TANK(a) TO K INSTALLED <br />�- A. steel-eted with fiberglass reinforced plastic coatings, composite$. or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) vacuum applied to interstitial space. <br />B. Fiberglass <br />(1) installation instructions require an air test and soap bubble test prior td"instattation. <br />(2) Vocuun applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank (Section 2635 (a) (2) (A)) <br />_._,- (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as ode quo to by a <br />corrosion specialist. <br />,,,- (3) Impressed current systems to be inspected no less than every 60 days. <br />