My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_1996-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:27:51 PM
Creation date
6/3/2020 9:47:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-2005
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_1996-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Piping (cross-sectional diem, including connections to tank and dispos). <br />Vent and tank riser primary containment system equipped with overfill prevention system that: <br />!i"' Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)J, or <br />✓ Provide positive shut off of flow to the tank at no more than 95 % (Section 2635 (b)(2)(C)], or <br />(B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade. <br />Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underground primary piping will meet all of the following requirements <br />_✓ Primary piping in contact with hazardous substance under normal ope ation conditions shall be: <br />installed inside a secondary containment system in the form of:econdary pipe_Vault or <br />_lined trench to be sloped to a collection sump at the low point of the piping. <br />,✓ Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />Lined trench used as secondary containment <br />Material compatible with the substance stored. <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />1� Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />k-'- Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: rE - 192;7-4- Model: _5 TrO rL( L P <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />20. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />21. Plan review and operating permit fees paid. <br />22.What is the approximate depth to <br />pp p ground water: <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />23. i Total number of tanks on site after installation: 2 <br />24. County/City Fire District and Building Department notified. <br />25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements) as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br />-,O1?1 k Title Date <br />CONDITIONS OF APPROVAL: SEE A 7?0C <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.