Laserfiche WebLink
C <br />Project Location <br />Owner Phone No. <br />Contractor Phone No. License No. <br />tai _ a. �. • .��I • XWAFMAi7 <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br />was placed in the excavation to 12 lifts: <br />_ A- Pea gravel --smooth, rounded material not more than one-half (12) inch in diameter <br />_ B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 da of roject completion, or submission <br />of verification that the select material described above will be placed at a minimum of fivse M cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br />Code Appendix Chapter 70. <br />Name(Print) <br />Title rant <br />Signature <br />' Shall be the responsible managing employee on the license or authorized agent. <br />