My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
1225
>
2300 - Underground Storage Tank Program
>
PR0231350
>
COMPLIANCE INFO_2006-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 2:39:04 PM
Creation date
6/3/2020 9:47:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2008
RECORD_ID
PR0231350
PE
2361
FACILITY_ID
FA0003690
FACILITY_NAME
LODI FOOD & LIQUOR*
STREET_NUMBER
1225
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
03710002
CURRENT_STATUS
01
SITE_LOCATION
1225 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231350_1225 W LOCKEFORD_2006-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Piping system layout Trenching,bedding and backfilling <br /> Although fiberglass pipe has excellent strength,it must be protected against impact <br /> which may occurfrom improper handling or during backfilling. <br /> • Provide a trench width equal to the pipe diameter plus six inches on each side. <br /> Separate multiple lines by at least 4 inches.Refer to Fig.6-1. <br /> • Provide a minimum of 18 inches of select backfill between the top of the pipe and <br /> unpaved ground surfaces. <br /> • Provide a minimum of inches of select backfill between the top of the pipe and <br /> reinforced concrete pavement(4 inches minimum thickness). <br /> • Provide a minimum of inches of select backfill between the top of the pipe and <br /> asphalt pavement(2 inches minimum thickness). <br /> • Slope the trench bottom evenly from the dispensers back to sumps or tanks at a <br /> minimum'A in/ft of slope.The use of"batter boards'is a very good way to achieve a <br /> properslope. <br /> • The trench bottom must be free of hard or sharp objects. <br /> • Grade the trench bottom with at least 6 inches of select backfill to provide firm,even <br /> support forthe pipe.Compact the subgrade well to prevent differential settling. <br /> • Protect the pipe from impact during backfilling and abrasion during operation by <br /> surrounding it with a minimum of four inches of select backfill such as washed <br /> sand,pea gravel(3/4-inch maximum)or crushed stone(Ih-inch maximum). <br /> None 0 <br /> Asphalt - 2(min) <br /> Concrete .' <br /> 4(min) <br /> _ 18(min) <br /> 6(min) <br /> 4(min) - V CO <br /> Fig.6-1.Use only select materials for Select backfill - 6(min) <br /> bedding and backfilling Dualoy 3000/L fuel <br /> handling systems.Native materials are rarely ' <br /> suitable and should not be used. <br /> Native 4(min) 6(min) <br /> sou <br /> Fig.6-2.During layout,bonding and <br /> inspection,support the piping on 2x4 <br /> blocks to keep the joints clean and to <br /> keep bedding <br /> out ofthe pipe. <br /> I <br /> i <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.