Laserfiche WebLink
3-26-1997 9:55AM FROM P. 9 <br /> 0 6 <br /> 19. Y Piping (:ress•secticnal diagram, including connections to tank and dispensers). <br /> (A) vent and tans riser primary containment system equipped with overfitt prevention system that: <br /> Restricts delivery of flow to tank [Section 2635 (b) (2) (S) or (C)I, or <br /> 5 n Provice positive shut off of flow to the tank at no mora than 95 X CStction 2635 (b)(2)(C)], or <br /> vapor recovery piping designed so it cannot contsin ti;Uid phase product, or <br /> r`a <br /> _ (C) Suction piping (below grade piping operates at fess than atmospheric pressure) [Section 2636 (a) (3)J <br /> "" <br /> ' !�( Sloped so contents of the pipe wilt drain bade into the storage tank if the suction is <br /> T1 released. <br /> No valves or pumps instatled below grade. <br /> inspection nethod provided tc deannstrste compliance with section 2636 (a) (3). <br /> (D) Corrodibte undergr=und piping protected against corrasion (Section 2636 (b)). <br /> (_) Underground pr;=ry piping wilt meet alt of the following requirements <br /> Primary piping in contact with hazardous substance under normal operation conditicns shall be: <br /> installed inside a secarldary containment system in the form of: YL secondary pipe vault or <br /> _tined trench :c 7e stoped to a eollecticn SUMP It the tow po nt of the piping. <br /> '- Primary piping and secondary containment syster:rs vitt be installed in accordance with industry <br /> code a-` practice and voluntary consensus standards.. <br /> ry!/7 Lined trench used as secondary containment <br /> materiat corpatibte with Vie substance stores. <br /> Covered and capabie of Supporting any expected vehicr.:tar traf`ic. <br /> (r') Undergrounc Piping with secondary containment will be equippee and monitored as f0tlows: <br /> Seconcary contairrhent will be equipr-c with a continuous monitoring system connected to an audibte <br /> and visual alarm system_ <br /> KAutomatic tin leak we�:ors will tee installed on r•ssurizec piping <br /> Manufacturer:FF- t�C) ro Model: 1 <br /> _ Annual monitoring wit. be conducted on tie -rzssurized riping wish se^_ardary containment. <br /> Arluat lire tightness test will not be required if the continuous monitor Shuts down the puma and <br /> activates to a alarm system when a release is detected and when the continuous monitoring systet <br /> fails or is discorhrec:ed. <br /> 20. State Vater Resources Centrcl Board "Facility (A)" and "Tank Permit (8)" appticstiOn forms submitted. <br /> 21. Plan review and operating permit fees paid. r r . - D <br /> 22. what is the approximate depth to ground water: _ ® R6 � � <br /> (include source of information borehole toss, monitoring well data, water <br /> jstudies, etc.) - APR 2 9 12?Z <br /> 23. Tetat nuWw of tanks on site after ins:atlation: .� ENVIRONMENTAL HEALTH <br /> 24. County/City fire District ar'� Building Department notified_ PERMIT/SERVICES <br /> 2<, in the event c ohcaminaticn is observed, canfir«ed or suspected as a result of a leaning UST system it is your <br /> responsibility Cin aetardance with (CCR) Title'23, Division3. Chapter 16, Articte 11, Corrective Action <br /> Requirements] as an owner or operator to submit a woriolan to DNS-SHO Site Mitigation Unit prior to initiating any <br /> assessment or remediation act.vities. for further assistance contact the Site Mitigation Unlit at (2()9) 669-3450. <br /> The owner o .a t. nowledge this respcnsibitity for wwoorkpt se,�mittat by signature nd is below. <br /> rt-E Title�/®���!fes 2yy Date <br /> Name �'G L <br /> CND t T I CiNS OF APoRCVAL: ICA— -IL1��' L <br /> n <br />