My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2420
>
2300 - Underground Storage Tank Program
>
PR0231382
>
COMPLIANCE INFO_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 8:56:06 PM
Creation date
6/3/2020 9:48:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997
RECORD_ID
PR0231382
PE
2361
FACILITY_ID
FA0004139
FACILITY_NAME
Plaza liquor and Gas
STREET_NUMBER
2420
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
2420 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231382_2420 W TURNER_1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(4) and 2641(h) CCR. <br /> Facility Name , a tih I-,hy v KV <br /> Facility Address L 1 %1 ix h o a L o ck; , Ci52L <br /> A. Describe the frequency of performing the monitoring: <br /> Tank ',.k4 - <br /> Piping ® lw <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring. <br /> Tank 1 1 1711 h Is <br /> Piping t ok.\..-e <br /> 1®- S c, fc. co o.0 Stiff <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> 0s 1L ® ,0 <br /> D. List the names) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> ® V S` ®® <br /> E. Reporting format for monitoring: <br /> Tank <br /> Piping x ® L, y <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every L?months: <br /> G. Describe the training necessary for the open tion of UST syste including piping, <br /> and the monitoring equipment: Alz L4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.